
7 - MAINTENANCE
Initial 10 hours
Air conditioning belt
Inspect the tension of a new air conditioning belt after the
first 10 hours of operation and then every 250 hours of
operation.
1.
Check the belt at the location shown with a belt ten-
sion gauge. Specification is
122 - 149 N·m
(
90 - 110
lb ft
).
RAIL11TLB0001AA
1
2.
If the belt tension does not meet specification:
A.
Loosen the pivot bolt
(1)
.
B.
Loosen the lock nut
(2)
.
C.
Turn the adjustment bolt
(3)
clockwise to
tighten the belt.
Turn the adjustment bolt
counter-clockwise belt will loosen.
D.
When adjustment is complete, tighten the lock
nut and pivot bolt.
RAIL11TLB0005AA
2
7-35
Содержание 570NXT
Страница 8: ......
Страница 23: ...1 GENERAL INFORMATION Symbol Definition Less than Greater than mg kg Milligrams per kilogram 1 15 ...
Страница 24: ...1 GENERAL INFORMATION 1 16 ...
Страница 88: ...3 CONTROLS INSTRUMENTS 3 28 ...
Страница 142: ...6 WORKING OPERATIONS 6 34 ...
Страница 167: ...7 MAINTENANCE Adjust Interval Page no Maintenance action No of pts As required 7 102 Disable parking brake X 7 25 ...
Страница 193: ...7 MAINTENANCE Cylinder closed end Two total one on each side RCPH10TLB258AAF 3 7 51 ...
Страница 197: ...7 MAINTENANCE 15 Check the fluid level and add if necessary Refer to page 7 41 for the procedure 7 55 ...
Страница 252: ...7 MAINTENANCE 7 110 ...
Страница 257: ...8 SPECIFICATIONS Machine overall dimensions 8 5 ...
Страница 259: ...8 SPECIFICATIONS RAIL12UTL0182GA 1 8 7 ...
Страница 260: ...8 SPECIFICATIONS 8 8 ...
Страница 262: ...8 SPECIFICATIONS RAIL12UTL0182GA 2 8 10 ...
Страница 272: ...9 ACCESSORIES 9 4 ...
Страница 279: ......