docs.carbide3d.com
8/31/2020
Version 4.0
30
Install the Drag Chain
Install the Drag Chain to the X-
and Y1-Rails
HDZ Kit:
Item
Description
Qty
II
M3
×
6mm Flat Head Screw
3
PP
M3
×
6mm Flat Head Screw
3
1.
Move the X-rail to the back of the machine.
2.
Lay the drag chain on the rails. See
Fig. 31
.
a.
First, place the three cables not threaded
through the X-Axis drag chain (the Y-Axis
proximity switch cable and the Y1- and
Y2-motor leads) over and behind the
X-rail
b.
Second, lift the drag chain and place it
across the Y1- and X-rails.
c.
Lay the drag chains so that the tail of the
Y-Axis drag chain will curl under and the
head of the X-Axis drag chain will curl up.
Figure 31
Shapeoko 3 Machines:
Skip ahead to the “Install the Proximity Switches”
section on page 32.
Содержание Shapeoko HDZ 4.0
Страница 1: ...support carbide3d com docs carbide3d com 9 2 2020 Version 4 0 1 ASSEMBLY GUIDE HDZ 4 0...
Страница 2: ...support carbide3d com docs carbide3d com 9 2 2020 Version 4 0 2...
Страница 8: ...support carbide3d com docs carbide3d com 8 31 2020 Version 4 0 8 Figure 2...
Страница 42: ...support carbide3d com docs carbide3d com 8 31 2020 Version 4 0 42 Figure 2...