docs.carbide3d.com
8/31/2020
Version 4.0
36
Cleanup the Cables
Secure Cables at Y1-Carriage and Z-Plus
HDZ Kit:
Item
Description
Qty
WW
Cable Ties
Several
1.
Secure the cables crossing the Y1-carriage plate.
See
Fig. 37
.
a.
Tuck all seven cables, one at a time, into
the cutout at the top of the Y1-carriage
plate.
b.
Use two (2) cable ties, one on each side of
the cutout, to secure the cables in place.
2.
Secure the cables at the rear of the HDZ. See
Fig. 38
.
a.
Bundle the X- and Z-cables at the rear of
the HDZ.
b.
Use a couple cable ties to secure the
cables.
Figure 37
Figure 38
Shapeoko 3 Machines:
Skip ahead to the “Secure Cables Along the X
-
Rail” section
on page 37.
Содержание Shapeoko HDZ 4.0
Страница 1: ...support carbide3d com docs carbide3d com 9 2 2020 Version 4 0 1 ASSEMBLY GUIDE HDZ 4 0...
Страница 2: ...support carbide3d com docs carbide3d com 9 2 2020 Version 4 0 2...
Страница 8: ...support carbide3d com docs carbide3d com 8 31 2020 Version 4 0 8 Figure 2...
Страница 42: ...support carbide3d com docs carbide3d com 8 31 2020 Version 4 0 42 Figure 2...