Section 7. Installation
jumper wire between terminals
VX1
and
SE1
.
3. Perform the simulated deployment calibration as follows:
a. For the first point, set variable
SimulatedFlowSignal
=
300
. Set variable
KnownFlow
=
30.0
.
b. Start the calibration by setting variable
CalMode
=
1
.
c. When
CalMode
increments to
3
, for the second point, set variable
SimulatedFlowSignal
=
550
. Set variable
KnownFlow
=
10
.
d. Resume the deployment calibration by setting variable
CalMode
=
4
4. When variable
CalMode
increments to
6
, the deployment calibration is
complete. Calibrated multiplier is
-0.08;
calibrated offset is
53.9
.
5. To continue this example, suppose the simulated sensor multiplier and offset
drift. Simulate a seven-day service calibration to correct the drift as follows:
a. Set variable
SimulatedFlowSignal
=
285
. Set variable
KnownFlow
=
30.0
.
b. Start the seven-day service calibration by setting variable
CalMode
=
1
.
c. When
CalMode
increments to
3
, set variable
SimulatedFlowSignal
=
522
.
Set variable
KnownFlow
=
10
.
d. Resume the calibration by setting variable
CalMode
=
4
6. When variable
CalMode
increments to
6
, the calibration is complete. The
corrected multiplier is
-0.08
; offset is
53.9
.
CRBasic Example 42.
FieldCal() Two-Point Slope and Offset
'This program example demonstrates the use of FieldCal() in calculating and applying a
'multiplier and offset calibration. A multiplier and offset calibration compares signal
'magnitudes of a sensor to known standards. The calculated multiplier and offset scale the
'reported magnitude of the sensor to a value consistent with the linear relationship that
'intersects known points sequentially entered in to the FieldCal() KnownVar parameter.
'Subsequent measurements are scaled by the new multiplier and offset.
'This program demonstrates the multiplier and offset calibration with the following procedure:
' -- Simulate a signal from a flow sensor.
' -- Measure the 'sensor' signal.
' -- Calculate and apply a multiplier and offset.
'You can set up the simulation by loading this program into the CR1000 and interconnecting
'the following terminals with a jumper wire to simulate a flow sensor signal as follows:
'
Vx1
---
SE
1
'For the simulation, the value of the calibration standard and the initial 'sensor' signal
'are set automatically. Start the multiplier-and-offset routine by setting variable
'CalMode = 1. The value in CalMode will increment automatically. When CalMode = 3, set
'variables SimulatedFlowSignal = 550 and KnownFlow = 10, then set CalMode = 4. CalMode
'will again increment automatically. When CalMode = 6 (occurs automatically after 10
219
Содержание CR1000
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 32: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 60: ...Section 4 System Quickstart Figure 16 PC200W View Line Graph 60 ...
Страница 96: ......
Страница 98: ...98 ...
Страница 302: ......
Страница 350: ...Section 8 Operation Figure 91 Pulse Sensor Output Signal Types Figure 92 Switch Closure Pulse Sensor 350 ...
Страница 453: ...Section 8 Operation Figure 115 Using the Keyboard Display 453 ...
Страница 454: ...Section 8 Operation 8 8 1 Data Display Figure 116 Displaying Data with the Keyboard Display 454 ...
Страница 456: ...Section 8 Operation Figure 118 Real Time Custom 456 ...
Страница 457: ...Section 8 Operation 8 8 1 3 Final Memory Tables Figure 119 Final Memory Tables 457 ...
Страница 458: ...Section 8 Operation 8 8 2 Run Stop Program Figure 120 Run Stop Program 458 ...
Страница 460: ...Section 8 Operation Figure 122 File Edit 460 ...
Страница 461: ...Section 8 Operation 8 8 4 PCCard Memory Card Display Figure 123 PCCard CF Card Display 461 ...
Страница 478: ......
Страница 506: ......
Страница 536: ......
Страница 636: ......
Страница 642: ......
Страница 644: ......
Страница 676: ......
Страница 677: ......