![Cambium Networks PTP 650 Series Скачать руководство пользователя страница 379](http://html.mh-extra.com/html/cambium-networks/ptp-650-series/ptp-650-series_user-manual_485688379.webp)
Chapter 7: Operation
Recovery mode
Procedure:
1
Click Erase Configuration. The erase pop up box is displayed:
2
Click OK. The erase confirmation page is displayed:
3
Click Reboot. When the confirmation message is displayed, click OK.
4
The unit reboots and starts up in normal mode but with all configuration erased. If the unit
fails to start up, refer to
Page
7-49
Содержание PTP 650 Series
Страница 1: ...Cambium PTP 650 Series User Guide System Release 650 01 01 ...
Страница 88: ...Chapter 3 System planning Typical deployment Figure 24 Wall installation Page 3 3 ...
Страница 89: ...Chapter 3 System planning Typical deployment Figure 25 Roof installation Page 3 4 ...
Страница 91: ...Chapter 3 System planning Typical deployment Figure 27 ODU with optical SFP and PSU interfaces Page 3 6 ...
Страница 92: ...Chapter 3 System planning Typical deployment Figure 28 ODU with Aux and PSU interfaces Page 3 7 ...
Страница 264: ...Chapter 6 Configuration and alignment System menu Figure 69 QoS Configuration page IP MPLS Page 6 31 ...
Страница 289: ...Chapter 6 Configuration and alignment Management menu Figure 82 Time Configuration page SNTP enabled Page 6 56 ...