Chapter 2
Ink Delivery System Installation
Page 2-10
Route cables through opening.
Figure 2-14:
Routing of the power and communication cables through the top of the controller box
.
2.2.2.2
Securing the IDM into the BK700 IDM bracket
1.
Place the Apollo IDM on the IDM mounting bracket.
2.
Use the two screws (
p/n 404510
) to secure the IDM in place as shown
in
Figure 2-15:
Securing the Apollo IDM to the BK700 IDM bracket.
Buskro Ltd.
Apollo Ink Delivery System
Содержание Apollo BK-IDM-4H
Страница 1: ...Apollo Ink Delivery System Part No 9103326 User s guide V1 2 ...
Страница 5: ...General Information Chapter 1 1 0 General Information Buskro Ltd Apollo Ink Delivery System ...
Страница 46: ...Operating Instructions Chapter 3 3 0 Operating Instructions Buskro Ltd Apollo Ink Delivery System ...
Страница 54: ...Printhead Maintenance Chapter 4 4 0 Printhead Maintenance Buskro Ltd Apollo Ink Delivery System ...
Страница 59: ...Troubleshooting Guide Chapter 5 5 0 Troubleshooting Guide Buskro Ltd Apollo Ink Delivery System ...