Chapter 2
Ink Delivery System Installation
Page 2-2
Existing Screws (SHCS 5/16-18 UNC)
Figure 2-1:
Removing existing screws from bridge
2.
Remove the two screws holding the bracket and mount together.
3.
Place the regulator bracket onto the bridge and ensure the bottom of
the bracket is about 0.83” to 1.83” above the printhead nozzles. Use
the two longer screws (SHCS 5/16-18 UNC) to secure it in place
(
4.
Place the regulator mount back onto bracket.
Figure 2-2
:
Attaching Regulator Assembly to the bridge.
Buskro Ltd.
Apollo Ink Delivery System
Содержание Apollo BK-IDM-4H
Страница 1: ...Apollo Ink Delivery System Part No 9103326 User s guide V1 2 ...
Страница 5: ...General Information Chapter 1 1 0 General Information Buskro Ltd Apollo Ink Delivery System ...
Страница 46: ...Operating Instructions Chapter 3 3 0 Operating Instructions Buskro Ltd Apollo Ink Delivery System ...
Страница 54: ...Printhead Maintenance Chapter 4 4 0 Printhead Maintenance Buskro Ltd Apollo Ink Delivery System ...
Страница 59: ...Troubleshooting Guide Chapter 5 5 0 Troubleshooting Guide Buskro Ltd Apollo Ink Delivery System ...