Technical information
and start-up
Fast Charger
NLG6xx
55
Procedure step
Illustration / Other Information
5.
Carefully install the charger at its installation
location.
Fasten the screws (1).
If mounting plates (adapter plates) are to be
used, these must be attached to the charger
first.
Torque = 20 Nm +/- 2 Nm
6.
Remove covers (1) of the cooling water
connections.
7.
Connect the cooling water connections (1) and (2)
to the charger.
Always check that cooling water inlet (1)
and cooling water outlet (2) are connected
correctly!
Ensure that the PS3 quick connection of
both connections is properly engaged!
Manually check if the connection is secure!
Содержание NLG664-U0
Страница 22: ...Technical information and start up Fast Charger NLG6xx 22...
Страница 32: ...Technical information and start up Fast Charger NLG6xx 32 6 7 Vehicle installation basic principle...
Страница 33: ...Technical information and start up Fast Charger NLG6xx 33 6 8 Block diagram...
Страница 41: ...Technical information and start up Fast Charger NLG6xx 41 5 V conforms to no Crash...
Страница 45: ...Technical information and start up Fast Charger NLG6xx 45...