Technical information
and start-up
Fast Charger
NLG6xx
56
Procedure step
Illustration / Other Information
8.
Establish earth connection to the chassis.
The charger is equipped with three earth
connections (1), (2) and (3). At least one
earth connector must be connected!
Torque = 12.5 Nm +/- 1.5 Nm
For information on earth connection refer to
9.
Connect the LV plugs (1) and (2) to the charger.
Manually check if the LV plugs (1) and (2)
are fastened securely!
Always ensure suitable mounting of the
required strain relief elements!
The tightness of the battery charger can
only be guaranteed if all the signal cables to
the signal connectors are packaged and
connected to a tight unit. If this is not the
case in one of the cables, it must be sealed
separately.
10.
Connect the mains plug (1) to the charger.
Manually check if the mains plug (1) is
secure!
Always ensure suitable mounting of the
required strain relief element!
Содержание NLG664-U0
Страница 22: ...Technical information and start up Fast Charger NLG6xx 22...
Страница 32: ...Technical information and start up Fast Charger NLG6xx 32 6 7 Vehicle installation basic principle...
Страница 33: ...Technical information and start up Fast Charger NLG6xx 33 6 8 Block diagram...
Страница 41: ...Technical information and start up Fast Charger NLG6xx 41 5 V conforms to no Crash...
Страница 45: ...Technical information and start up Fast Charger NLG6xx 45...