Cryo-Torr 8600 Compressor Operation, Installation and Maintenance Guide
©2013 Brooks Automation Inc.
Pub. No. 8040564, Rev. AA, 01/15/13
ECO No. 64541
2-1
Section 2 - Installation
Introduction
Installation information is presented for experienced and non-experienced
On-Board GLE Cryopump system technicians. The flowchart in
highlights the major tasks of On-Board GLE Cryopump installation.
Refer to
and the appropriate installation procedure within this
section for the type of On-Board GLE Cryopump being installed.
Figure 2-1: Block Diagram for On-Board GLE Cryopump Installation
On-Board GLE Cryopump
Installation
(Refer to Page 2-2)
Roughing Pump
Connection
(Refer to Page 2-3)
Purge Gas Connection
(Refer to Page 2-3)
AUX TC Gauge
Installation
(Refer to Page 2-4)
Setpoint Relays
(Refer to Page 2-4)
Remote
Keypad/Display Installation
(optional)
(Refer to Page 2-6)
Vent Pipe Connection
(Refer to Page 2-2)
Helium Line
Connections
(Refer to Page 2-4)
Rough Valve Gas
Connection
(Refer to Page 2-3)
Содержание On-Board 8
Страница 1: ...On Board GLE Cryopump Installation and Maintenance Instructions 8040564 Revision AA...
Страница 6: ...This Page Left Intentionally Blank...
Страница 8: ...This Page Left Intentionally Blank...
Страница 36: ...This Page Left Intentionally Blank...
Страница 52: ...This Page Left Intentionally Blank...
Страница 54: ...This Page Left Intentionally Blank...