Cryo-Torr 8600 Compressor Operation, Installation and Maintenance Guide
©2013 Brooks Automation Inc.
Pub. No. 8040564, Rev. AA, 01/15/13
ECO No. 64541
1-11
cold head operation. When cold head operation reaches a steady-state
condition, further pressure regulation is unnecessary.
A typical On-Board 8 GLE Cryopump system is shown in
.
The location of helium and electrical components of typical flat and
straight On-Board 8 GLE Cryopumps are shown in
respectively.
Содержание On-Board 8
Страница 1: ...On Board GLE Cryopump Installation and Maintenance Instructions 8040564 Revision AA...
Страница 6: ...This Page Left Intentionally Blank...
Страница 8: ...This Page Left Intentionally Blank...
Страница 36: ...This Page Left Intentionally Blank...
Страница 52: ...This Page Left Intentionally Blank...
Страница 54: ...This Page Left Intentionally Blank...