NetXtreme II
User Guide
January 2010
Bro a d c o m C o rp o r a ti o n
Page 26
Executive Summary
Document
ENGSRVT52-CDUM100-R
S
ELECTING
A
T
EAM
T
YPE
The following flow chart provides the decision flow when planning for Layer 2 teaming. For TOE teaming, only Smart Load
Balancing™ and Failover type team is supported. The primary rationale for teaming is the need for additional network
bandwidth and fault tolerance. Teaming offers link aggregation and fault tolerance to meet both of these requirements.
Preference teaming should be selected in the following order: Link Aggregation as the first choice, Generic Trunking as the
second choice, and SLB teaming as the third choice when using unmanaged switches or switches that do not support the
first two options. if switch fault tolerance is a requirement, then SLB is the only choice (see
).
Figure 1: Process for Selecting a Team Type
Содержание BCM5706C
Страница 192: ...NetXtreme II User Guide January 2010 Broadcom Corporation Page 192 Configuring Teaming Document ENGSRVT52 CDUM100 R...
Страница 218: ...NetXtreme II User Guide January 2010 Broadcom Corporation Page 218 CE Notice Document ENGSRVT52 CDUM100 R...
Страница 219: ...User Guide NetXtreme II January 2010 Broadcom Corporation Document ENGSRVT52 CDUM100 R CE Notice Page 219...
Страница 220: ...NetXtreme II User Guide January 2010 Broadcom Corporation Page 220 CE Notice Document ENGSRVT52 CDUM100 R...
Страница 221: ...User Guide NetXtreme II January 2010 Broadcom Corporation Document ENGSRVT52 CDUM100 R CE Notice Page 221...
Страница 222: ...NetXtreme II User Guide January 2010 Broadcom Corporation Page 222 CE Notice Document ENGSRVT52 CDUM100 R...