S2000R
Appendix A. Batteries
91
www.bolid.ru
Testing Link Quality
The Link Quality Test procedure is designed to estimate stability of radio link between the module and
the ARR32 at their current locations and when obstructions exist on the path of radio signals. You are
recommended to carry out the Link Quality Test before the devices are attached at their locations.
A Link Quality Test is started by a short press on the Prog button (see Figure 10-19). The procedure
lasts 60 seconds, the RADIO LED being indicating the results of the test as shown in Table 10-45.
As testing the alarm is in progress you can move the module and the ARR32 to find the best locations
for them.
You can also estimate quality of the link using S2000R Configurator as discussed in Section 7.
Mounting
Mount the S2000R-RM rev.01 to a flat vertical surface using the two screws provided or on a DIN rail.
Figure 10-20. Overall and Mounting Dimensions of the S2000R-RM rev.01
Connecting Mains Power and Executive Devices
The module’s outputs are the normally open relay contacts.
To provide protection against overload and short circuits, a fuse is brought into the circuit of each
relay.
The outputs are controlled by commands sent over the radio link in accordance with parameters
configured in the configuration of the polling loop controller by UProg Configuration Tool.
If you need to check or to change the fuses, shut off mains power (220 V) prior to
opening the module case