this repair group.
Due to flexible sprocket design,
VANOS unit tolerances, and play
in the VANOS splines, when the
camshaft timing is set correctly,
the intake side of special tool 11 3
240 may be up to 1 mm (0.04 in)
above the surface of the cylinder
head (gap
B
).This is normal.
Otherwise, retime the camshafts
as described later in this repair
group.
-
Remove VANOS setup bracket
from front of cylinder head.
-
Install VANOS unit. See
VANOS control unit
, given later.
-
Install intake camshaft oil baffle
Install cylinder head cover.
Check for correct seating of
half-moon seals (
A
) in back of
cylinder head cover.
Use a small amount of
3-Bond®1209 or equivalent
sealant at corners (
B
) of
half-moon cutouts. Seal corners in
front of cylinder head at VANOS
unit.
Tightening torque
Cylinder head
cover to cylinder
head
10 Nm (89 in-lb)
-
Reassemble remainder of engine:
Camshaft Timing Chain
http://ebahn.bentleypublishers.com/BMW/3/E46/Repair%20Manuals/1...
10 of 11
2/25/2009 9:51 PM