-
Repeat procedure for exhaust
camshaft.
Note:
Before the next step, observe waiting
time for lifter bleed down before
continuing with camshaft installation.
Crankshaft / valve timing waiting
times
68°F (20°C) and
higher
4 minutes
50 - 68°F (10 -
20°C)
11 minutes
32 - 50°F (0 -
10°C)
30 minutes
Secure camshafts in TDC position
using BMW special tools 11 3 240 and
11 3 244.
If necessary, turn camshaft so that
special tools are squarely seated on
cylinder head.
Cylinder Head Removal and Installation
http://ebahn.bentleypublishers.com/BMW/3/E46/Repair%20Manuals/1...
7 of 21
2/25/2009 9:42 PM