-73-
Revision 7/F3527
©
Moffat Ltd, November 2004
2 (S1)
1
3 (H.V.)
2 (FP)
1 (GND)
3 (H.V.)
f)
Attach replacement ignition box panel assembly to unit (2 screws).
g)
Close control panel ensuring no trapped wires and thermostat capillary is clear of HT
terminal.
h)
Test unit operation.
a)
Turn power off and disconnect from supply. Open control panel.
b)
Remove ignition box mounting panel assembly (2 screws).
c)
Unscrew transformer from panel (for re-use on new assembly).
Cut all cable ties securing wires to panel.
d)
Secure transformer to replacement mounting panel. (Note: transformer overload switch to
the rear).
e)
Rewire ignition box as described below.
1)
Remove green wire (1) from old ignition box.
Remove terminal, strip wire and connect to terminal block.
2)
Remove red wire (2) from ignition box.
Re-terminate
with
3
/
16
” terminal (supplied) and fit to ignition box S1.
3)
Remove HT lead (3) from ignition box.
Terminate
with
1
/
4
” terminal (supplied) and fit to ignition box.
4)
Transfer all transformer wires from old terminal block to new terminal block.
5)
Transfer gas valve solenoid wires (2 pairs) from old terminal block to new terminal
block.
A.2 WHITE RODGERS TO FENWAL IGNITION BOX REPLACEMENT KIT
For G32 gas convection oven models G32W (USA/Canada)
For serial number up to 203926
White Rodgers Assembly
Fenwal Assembly (new Assembly)
Содержание 203926
Страница 58: ...58 Revision 7 F3527 Moffat Ltd November 2004 11 PARTS DIAGRAMS 11 1 MAIN ASSEMBLY...
Страница 61: ...61 Revision 7 F3527 Moffat Ltd November 2004 11 2 CONTROL PANEL ASSEMBLY Mounted on item 6 Main assembly...
Страница 67: ...67 Revision 7 F3527 Moffat Ltd November 2004 11 4 GAS PIPING ASSEMBLY...