MT2136
2-1
OVEN ASSEMBLY PROCEDURES
NOZZLES
1. Install the nozzles from the center of the oven
working toward the ends. Make sure the top
tongue of each nozzle fits into the upper recĆ
tangular cutĆout in the nozzle support plate at
the top rear of the oven.
2. Pull the nozzle slightly forward to engage the
hole in the alignment flange with the conveyor
rail pin. To make sure that the nozzle is seated
properly, try to move it from side to side. The
nozzle should not move any appreciable disĆ
tance.
CONVEYOR SUPPORTS
1. Slide the left conveyor belt support (with the
sprocket on the end of the shaft) into the supĆ
port tracks. The sprocket must be located next
to the control panel after being pushed into the
oven.
2. Slide the right conveyor belt support into the
support tracks.
3. Install the 1/4-20 (6m x 1) hex head screw
through the conveyor rack and into the control
box.
DRIVE CHAIN
1. Install the drive chain around the drive motor,
through the opening in the control panel door,
and then around the sprocket on the conveyor
belt support.
2. Push the conveyor motor to tighten the drive
chain and lock it into position by tightening the
hex socket head screws.
NOTE: Twin belt models have a double sprocket,
chain and motor.
WIRE CONVEYOR BELT
NOTE: The conveyor belt has loops on both sides.
The belt must be installed so the loops travĆ
el as shown in FIGURE 1.
1. Thread the wire belt from the right side of the
oven, lower level first.
2. After pushing the belt through on the lower levĆ
el, leave about 12" (30.5 cm) hanging out on
the left side.
3. Take the remainder of the belt, loop it around
the right shaft, and push it through on the upĆ
per level. The two ends of the belt should be
approximately 6Ć9" (15Ć22 cm) past the left
shaft (right shaft if right to left travel is required)
on the upper level of the belt support.
Side Belt Loops
Direction of
Travel
FIGURE 1
4. Install the inner and outer master links as
shown in FIGURE 2.
Master
Link
Direction of
Travel
FIGURE 2
Содержание MT2136 Series
Страница 4: ...INTRODUCTION CHAPTER 1 ...
Страница 15: ...MT2136 1 11 35 30 35 29 39 28 38 33 34 31 37 36 26 27 32 EXTERIOR COMPONENTS FIGURE 3 ...
Страница 17: ...MT2136 1 13 CE GAS BURNER COMPONENTS Control Box not Shown 16 17 FIGURE 5 ...
Страница 18: ...INTRODUCTION 1 14 CONTROL PLATE ASSEMBLY 18 25 16 26 21 19 20 24 23 22 EXCLUSIVE TO CE 40 41 42 43 FIGURE 6 ...
Страница 19: ...MT2136 1 15 This page intentionally left blank ...
Страница 20: ...ASSEMBLY CHAPTER 2 ...
Страница 23: ...MT2136 2 3 This page intentionally left blank ...
Страница 24: ...OPERATION CHAPTER 3 ...
Страница 49: ...MT2136 3 25 16 17 18 19 20 21 12 13 13 13 4 7 15 3 2 1 14 8 9 10 6 11 5 5 FIGURE 4 ...
Страница 50: ...OPERATION 3 26 16 17 20 19 18 15 3 12 13 13 13 4 14 7 1 2 8 9 10 6 11 5 5 FIGURE 5 ...
Страница 51: ...MT2136 3 27 22 23 24 25 26 21 19 18 18 18 4 7 1 3 2 20 5 5 11 12 13 14 15 16 8 17 6 9 10 FIGURE 6 ...
Страница 52: ...OPERATION 3 28 25 26 27 29 28 2 24 23 22 21 21 21 3 1 7 20 4 16 17 18 19 14 15 8 10 6 11 12 13 9 5 5 FIGURE 7 ...
Страница 53: ...MT2136 3 29 1 17 3 2 4 16 16 16 15 21 5 13 14 14 10 18 19 6 7 8 20 9 12 11 FIGURE 8 ...
Страница 54: ...OPERATION 3 30 1 18 16 16 16 16 17 15 22 5 3 2 4 13 10 19 20 6 7 8 21 9 12 11 14 14 FIGURE 9 ...
Страница 55: ...MT2136 3 31 1 21 21 21 17 16 22 18 20 19 14 3 2 4 11 6 13 12 15 10 7 8 9 5 FIGURE 10 ...
Страница 56: ...OPERATION 3 32 1 8 8 8 8 6 7 16 15 17 18 3 2 4 11 5 9 9 12 13 14 FIGURE 11 ...
Страница 57: ...MT2136 3 33 1 6 9 8 19 22 21 7 16 17 2 3 4 18 5 10 14 20 12 11 13 15 25 25 25 24 FIGURE 12 ...
Страница 58: ...OPERATION 3 34 1 FIGURE 13 ...
Страница 60: ...CALIBRATION AND ADJUSTMENT CHAPTER 4 ...
Страница 77: ...MT2136 4 17 This page intentionally left blank ...
Страница 78: ...TROUBLESHOOTING CHAPTER 5 ...
Страница 86: ...TECHNICAL APPENDIX CHAPTER 6 ...