VDL (E3.1) 06/2020
Page 93/206
•
Upon initial commissioning: Test before initial commissioning performed and passed (chap. 7)
•
Technical ventilation is activated
•
10 minutes sweeping the area for electrical equipment and controller housing
Establish the power connection: connect the power plug (chap. 6.9). Connect the power supply only when
needed, and disconnect it when the chamber is not in use for an extended period.
After establishing power supply the pilot lamp in the controller housing shows readiness for operation.
The authorization level is “User”. To be able to use the entire functionality of the controller, log in with the
desired authorization level.
All parameters, set-points and settings remain the same as before turning off.
•
If the Standby mode had been activated prior to the power failure, the chamber remains off after the
power returns. To operate it you must sign in with a higher authorization level and deactivate the
standby mode.
•
If the Standby mode had been deactivated prior to the power failure, operation continues after the
power returns with previously entered parameters. If the pressure reaches or falls below the required
pressure threshold of 100 mbar, the heater turns on depending on the setpoint
9.6
Standby mode Turning on and off the vacuum drying oven
Before turning on the chamber, the following points must surely be met:
•
Equipotential bonding established (Chap. 6.8)
•
Technical ventilation is activated
•
10 minutes sweeping the area for electrical equipment and the controller housing
Activate the chamber only as required. Switch the chamber to standby mode when it is not in use.
In standby mode no solvents may remain inside the chamber!
Before turning off the chamber (activating standby mode), completely remove all solvents from
the chamber and its surroundings.
All settings and target values remain saved in standby mode.
If a program is running, it will be canceled by activating the standby mode
In Standby mode, the heating is off, and all valves are closed. Heating control and pressure control are
off.
To completely separate the chamber from the power supply, you must disconnect the power plug.
For decommissioning observe the guidelines in chap. 27.2.
Required authorization: “Admin”.
Press the
Setpoint setting
icon to access the “Setpoint” setting menu from Normal display..
Path:
Setpoint > Fixed value operation setpoints > Functions on/off
In this menu you can activate and deactivate the Standby mode .
Содержание vdl 115
Страница 192: ...VDL E3 1 06 2020 Page 192 206 28 6 Dimensions 28 6 1 VDL 23 Dimensions in mm ...
Страница 193: ...VDL E3 1 06 2020 Page 193 206 28 6 2 VDL 56 Dimensions in mm ...
Страница 194: ...VDL E3 1 06 2020 Page 194 206 28 6 3 VDL 115 Dimensions in mm ...
Страница 197: ...VDL E3 1 06 2020 Page 197 206 30 Certificates and declarations of conformity 30 1 EU Declaration of Conformity ...
Страница 198: ...VDL E3 1 06 2020 Page 198 206 ...
Страница 199: ...VDL E3 1 06 2020 Page 199 206 ...
Страница 200: ...VDL E3 1 06 2020 Page 200 206 31 Product registration ...
Страница 207: ......