VDL (E3.1) 06/2020
Page 4/206
8.5
Principle of controller entries ............................................................................................................. 86
8.6
Performance during and after power failures .................................................................................... 87
9.
START UP AND PERFORMING THE DRYING PROCESS ................................ 88
9.1
Requirements for safe commissioning .............................................................................................. 88
9.2
Setting the pressure regulator for sweeping with compressed air / inert gas ................................... 89
9.3
Overview of the drying process ......................................................................................................... 90
9.4
Sweeping the area for electrical equipment and controller housing (triangular instrument box) ...... 92
9.4.1
Sweeping before starting up the chamber .............................................................................. 92
9.4.2
Sweeping during chamber operation ...................................................................................... 92
9.5
Condition after establishing the power connection ........................................................................... 92
9.6
Standby mode Turning on and off the vacuum drying oven ............................................................. 93
9.7
Controller settings upon start up ....................................................................................................... 94
9.8
Loading.............................................................................................................................................. 95
9.9
Evacuation......................................................................................................................................... 97
9.10
Breaking the vacuum (flooding) ........................................................................................................ 97
9.10.1
Ventilation after completing the drying procedure (flooding with ambient air or inert gas) ..... 97
9.10.2
Operation with inert gas .......................................................................................................... 98
9.10.3
Ventilation / breaking the vacuum in case of a power failure ................................................. 98
9.10.4
Ventilation before completing the drying procedure (flooding with ambient air or inert gas) .. 99
9.11
Unloading the loading material ......................................................................................................... 99
9.12
Removing the full condensate catchpot of the pump ...................................................................... 100
9.13
Preparing a new drying process ..................................................................................................... 100
10.
SET-POINT ENTRY ............................................................................................ 101
10.1.1
Set-point entry through the “Setpoints” menu ....................................................................... 101
10.1.2
Direct setpoint entry via Normal display ............................................................................... 102
11.
SETTING SPECIAL CONTROLLER FUNCTIONS ............................................ 103
11.1
Menu structure ................................................................................................................................ 103
11.1.1
“Functions on/off” menu ........................................................................................................ 103
11.1.2
“Control on/off” menu ............................................................................................................ 104
11.2
Using the optional universal connection “GAS/AIR 2” for ventilation .............................................. 104
11.3
Close all valves ............................................................................................................................... 105
11.4
Activating / deactivating temperature control .................................................................................. 106
11.5
Activating / deactivating pressure control ....................................................................................... 107
11.6
Drying monitoring ............................................................................................................................ 108
12.
AUTHORIZATION LEVELS AND PASSWORD PROTECTION ........................ 110
12.1
User management, authorization levels and password protection ................................................. 110
12.2
Log in ............................................................................................................................................... 113
12.3
Log out ............................................................................................................................................ 114
12.4
User change .................................................................................................................................... 114
12.5
Password assignment and password change................................................................................. 115
12.5.1
Password change ................................................................................................................. 115
12.5.2
Deleting the password for an individual authorization level .................................................. 117
12.5.3
New password assignment for “service” or “admin” authorization level when the password
function was deactivated ................................................................................................. 118
12.6
Activation code ................................................................................................................................ 119
13.
GENERAL CONTROLLER SETTINGS AND INFORMATION ........................... 120
13.1
Selecting the controller’s menu language ....................................................................................... 120
13.2
Setting date and time ...................................................................................................................... 120
13.3
Selecting the temperature unit ........................................................................................................ 122
13.4
Display configuration ....................................................................................................................... 122
13.4.1
Adapting the display parameters .......................................................................................... 122
13.4.2
Touchscreen calibration ........................................................................................................ 123
13.5
Event list .......................................................................................................................................... 124
13.6
Service contact page ....................................................................................................................... 124
Содержание vdl 115
Страница 192: ...VDL E3 1 06 2020 Page 192 206 28 6 Dimensions 28 6 1 VDL 23 Dimensions in mm ...
Страница 193: ...VDL E3 1 06 2020 Page 193 206 28 6 2 VDL 56 Dimensions in mm ...
Страница 194: ...VDL E3 1 06 2020 Page 194 206 28 6 3 VDL 115 Dimensions in mm ...
Страница 197: ...VDL E3 1 06 2020 Page 197 206 30 Certificates and declarations of conformity 30 1 EU Declaration of Conformity ...
Страница 198: ...VDL E3 1 06 2020 Page 198 206 ...
Страница 199: ...VDL E3 1 06 2020 Page 199 206 ...
Страница 200: ...VDL E3 1 06 2020 Page 200 206 31 Product registration ...
Страница 207: ......