
VDL (E3.1) 06/2020
Page 100/206
•
Activate Standby mode on the controller before opening the door.
•
Ensure equipotential bonding: The accessible installation and operating area in front of the equipment
must be conductive. This installation and operating area must be connected to the vacuum drying ov-
en and other equipment according to the grounding plan (chap. 6.8).
•
Activate the technical ventilation (extraction):
The operator shall provide active extraction (technical ventilation according to country-specific regula-
tions – TRBS 2152 Part 2 for Germany) prior to commissioning the oven. Extraction must include the
entire installation area of the vacuum drying oven. Unloading the loading material must take place in
the safety area in front of the oven with technical ventilation.
•
The personal protective equipment (PPE) of the operating personnel must be implemented
ESDprotected.
•
Sweep the area for electrical equipment at least 10 minutes with compressed air or inert gas.
9.12
Removing the full condensate catchpot of the pump
Do not remove the full condensate catchpot of the pump without technical ventilation
Note the following points before removing the condensate catchpot:
When removing the condensate catchpot spilling of the solvent may occur.
•
Ensure equipotential bonding:
The accessible installation and operation area of the equipment must be conductive. This area and the
vacuum pump must be connected with the vacuum drying oven according to the grounding plan
(Chap. 6.8).
•
Activate the technical ventilation (extraction):
The operator shall provide active extraction (technical ventilation according to country-specific regula-
tions – TRBS 2152 Part 2 for Germany) prior to manipulating the condensate catchpot of the pump.
Extraction must include the entire installation area of the VDL and the vacuum pump, especially the
area of the catchpot (when removing it) and the exhaust air of the vacuum pump. Removing the full
condensate catchpot must take place under technical ventilation.
•
Use ESD protected personal protective equipment:
The personal protective equipment (PPE) of the operating personnel must be implemented ESD pro-
tected. This includes also gloves.
9.13
Preparing a new drying process
Before starting a new drying process with a different auto-ignition temperature, determine the auto-
ignition temperature of the solvent according to its safety data sheet. In the case of solvent mixtures, use
the lowest auto-ignition temperature.
Check all settings (drying temperature, pressure set-point and safety controller setting). If appropriate,
make sure that the new temperature set-point and safety controller value are entered on the controller.
With each change of the temperature set-point, observe the safety controller setting.
Содержание vdl 115
Страница 192: ...VDL E3 1 06 2020 Page 192 206 28 6 Dimensions 28 6 1 VDL 23 Dimensions in mm ...
Страница 193: ...VDL E3 1 06 2020 Page 193 206 28 6 2 VDL 56 Dimensions in mm ...
Страница 194: ...VDL E3 1 06 2020 Page 194 206 28 6 3 VDL 115 Dimensions in mm ...
Страница 197: ...VDL E3 1 06 2020 Page 197 206 30 Certificates and declarations of conformity 30 1 EU Declaration of Conformity ...
Страница 198: ...VDL E3 1 06 2020 Page 198 206 ...
Страница 199: ...VDL E3 1 06 2020 Page 199 206 ...
Страница 200: ...VDL E3 1 06 2020 Page 200 206 31 Product registration ...
Страница 207: ......