
U
SER
’
S
AND
I
NSTALLER
’
S
M
ANUAL
I
NSTALLATION
Version: 4.0 (23-08-2007)
23
Adjusting discharge duct
If linking two or more units to each other, you must adjust the
discharge duct so that the finishing edges will not be in each
other’s way.
1. Remove the end piece with finishing edge
1
.
2. Mount the end piece without finishing edge
2
.
Mounting discharge duct
3. Make a hole in the ceiling for the discharge (for dimen-
sions, see
Table 2-2
).
4. Fix the two angle sections
3
with sheet metal screws to
the unit, along the edges of the discharge opening.
5. Slide the discharge duct
4
into the discharge opening until
the desired height is reached.
6. Using sheet metal screws, fix the discharge duct to the
angle sections
3
.
1
2
3
4
Table 2-2
Discharge section hole dimensions
R
EFERENCE
T
YPE
D
IMENSIONS
a
CA S-R
102 mm
CA M-R
102 mm
CA L-R
133.5 mm
CA XL-R
133.5 mm
b
CA 100-R
1,008 mm
CA 150-R
1,508 mm
CA 200-R
2,008 mm
CA 250-R
2,508 mm
b
a