Overview
2-1
2
Installing the Control Unit
2
If you have not read Chapter 1, “Introduction,” do so before continuing with this
chapter.
Overview
2
Installing the control unit involves the following procedures:
■
Preparation requirements
■
Installing the backboard
■
Meeting the power and grounding requirements
■
Checking the total unit load
■
Installing the carrier
■
Installing any expansion carriers
■
Installing the power supply
■
Installing the processor
■
Installing the line/trunk and extension modules
■
Connecting the control unit to AC power
■
Powering up the system
■
Powering down the system
The following sections provide detailed instructions for these installation
procedures. Follow the procedures in the order in which they are presented.
Содержание Lucent Technologies MERLIN MAGIX
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 24: ...PCMCIA Translation Card 1 12 Installation SPM Maintenance and Troubleshooting Supplement ...
Страница 162: ...Installing the E911 Adjunct 6 8 Installation SPM Maintenance and Troubleshooting Supplement ...
Страница 178: ...PCMCIA Upgrade Card 7 16 Installation SPM Maintenance and Troubleshooting Supplement ...
Страница 266: ...Flow Control 8 88 Installation SPM Maintenance and Troubleshooting Supplement ...