Belarus 80.1/80.2/82.1/82.2/82
Р — Operation and Service Manual
Section 5. Final Assembly and Running-In
41
Figs. 13, 14. Starting pre-
heater:
1
— plugпробка; 2 — water-
delivery pipe (to be installed on
the r-h side of the diesel-
engine); 3
— water jacket; 4 —
water discharge pipe; 5
— oil
casing enclosure; 6, 23
—
brackets; 7
— hot-gas supply
branch-pipe; 8
— glower plug
cable; 9
— glower plug; 10—
boiler ; 11
— air-supply branch-
pipe: 12
— fan flap; 13 — fan;
14
— clamps; 15 — electric
motor; 16
— electric motor
bracket; 17
— drain tap; 18 —
boiler bracket; 19
— electric
motor cable: 20
— fuel supply
pipe to burner; 21
— electro-
magnetic valve cable; 22
—
electromagnetic valve; 24
—
fuel tank; 25
— fuel feed pipe;
26
— shut-off cock; 27 — filler
throat cap; 28
— bundle of ca-
bles; 29
— control panel; 30 —
glower plug switch: 31
— check
glowing spiral; 32
— switch con-
trol knob; 33
— external jacket;
34
— coolant supply manifold;
35
— inner water jacket; 36 —
unburned fuel drain pipe; 37
—
baffle: 38
— combustor; 39 —
swirler; 40
— fan impeller: 41 —
hot water discharge branch-
pipe; 42
— electromagnetic
valve body; 43
— gland nut; 44
— adjusting needle; 45 — valve
saddle; 46
— valve; 47 — mov-
ing core; 48
— stationary core;
49
— coil; 50 — filler throat filter.
Рис.13.
Рис. 14