background image

EN

BEKOMAT

®

 

13i

BEKOMAT

®

 13i CO

BEKOMAT

®

 13i CO PN50

01-4272

Original installation and operation manual

 >BM13i
 >BM13iCO
 >BM13iCOPN50

Содержание BEKOMAT BM13i

Страница 1: ...EN BEKOMAT 13i BEKOMAT 13i CO BEKOMAT 13i CO PN50 01 4272 Original installation and operation manual BM13i BM13iCO BM13iCOPN50 ...

Страница 2: ... 11 2 5 6 Maintenance 12 2 5 7 Handling hazardous substances 12 2 5 8 Use of spare parts accessories or materials 13 2 6 Warning notices 13 3 Product information 14 3 1 Exploded view BEKOMAT 13i BEKOMAT 13i CO 14 3 2 Exploded view BEKOMAT 13i CO PN50 16 3 3 Product overview 18 3 4 Function description 19 3 5 Modbus function 20 3 5 1 Default interface parameters 20 3 5 2 Byte sequence 20 3 5 3 Impl...

Страница 3: ... notices 34 6 2 Assembly conditions 35 6 3 Assembly work 37 7 Electrical installation 39 7 1 Warning notices 39 7 2 Connection work 40 7 2 1 Single device connection 41 7 2 2 Connecting multiple Modbus devices series connection 43 8 Commissioning 45 8 1 Warning notices 45 8 2 Commissioning work 46 9 Operation 47 9 1 Warning notices 47 9 2 Operating states 48 10 Maintenance 50 10 1 Warning notices ...

Страница 4: ...k 66 13 Dismantling 67 13 1 Warning notices 67 13 2 Dismantling work 68 14 Disposal 69 14 1 Warning notices 69 14 2 Disposal of operational materials and components 70 15 Troubleshooting and fault repair FAQ 71 16 Appendices 72 16 1 Approval certificates and declarations of conformity 72 16 2 Declaration of Conformity 74 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 4 7...

Страница 5: ...phs technical drawings diagrams and other representations are protected by the copyright of the manufacturer This applies especially to duplication reproduction microfilming and storage as well as processing in electronic systems Publication date Revision Version Reason for amendment Scope of amendment 18 May 2021 01 00 Editorial revision Editorial changes 30 June 2021 02 00 Change in technical da...

Страница 6: ...ater exposure that can occur The splash water must be free of corrosive components Only use the product and accessories in areas which are free of toxic and corrosive chemicals and gases Only use the product and accessories within the piping system designed for the technical data with appropriate connections pipe diameters and assembly clearances Only use the product and accessories outside potent...

Страница 7: ...es which are not listed here the manufacturer must be informed immediately 2 2 Responsibility of the operating company The responsible operating company must ensure the following to prevent accidents incidents and adverse effects on the environment Before all actions check to ensure that the manual available does in fact belong to the product The product and the accessories are used serviced and r...

Страница 8: ...d plants are people who due to their training professional experience and qualification possess all the necessary capabilities to safely execute actions and instruct all actions related to pressurised fluids and systems to independently foresee potential hazardous situations and implement appropriate measures to avert any danger The capabilities include in particular experience in handling measuri...

Страница 9: ...tion Symbol Description explanation General warning symbol danger warning caution Warning pressurised system Warning electric voltage Observe the installation and operation manual General note Wear safety footwear Use protective gloves cut proof and liquid resistant Wear safety goggles with side shields i General information Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50...

Страница 10: ...sories may lead to serious personal injuries or death To guarantee safe operation of the product and accessories observe the following points Use suitable protective equipment during all work on the product or accessories Adhere to the limits and operating parameters specified on the type plate and in the manual Adhere to the assembly conditions and ambient conditions Check whether the permissible...

Страница 11: ...ging the product and accessories carefully Transport and handle the packaged product and accessories according to the markings on the packaging note lifting gear attachment points the centre of gravity and alignment e g keep vertical do not throw etc Only use proper means of transport and lifting equipment that is in proper working order Always adhere to the permissible transport and storage param...

Страница 12: ... Prevent contamination from entering the opened product or accessories Store the disassembled components and accessories directly in a safe place After completing maintenance and repair work remove all the tools and cleaning media used as well as all parts that are no longer needed from the work area Only dispose of the product and accessories when cleaned and freed of any media residue Dispose of...

Страница 13: ...Warning notices warn against dangers when handling the product and accessories In order to prevent accidents personal injury and damage to property as well as impairments during operation it is essential to adhere to the warning notices Structural set up SIGNAL WORD Type and source of danger Symbol Possible consequences if the danger is ignored Measure to prevent the danger Signal words DANGER Imm...

Страница 14: ...ontrol circuit board 14 Solenoid valve connector 44 Screw M3 x 6 15 Fixing screw 45 Cable clamp 16 Core guide pipe 46 Cord packing 2 x 315 mm 17 Oval ring 21 8 x 1 5 x 2 5 mm 47 Power control board 18 Valve core with spring 48 Solenoid coil 19 Screw M5 x 20 49 O ring 11 1 x 1 78 mm 20 Membrane cap 50 Screw M4 x 10 21 O ring 5 5 x 1 5 mm 51 Flange 22 Pressure spring 52 O ring 5 x 1 5 mm top O ring ...

Страница 15: ...4 43 42 39 40 41 28 27 26 25 23 22 4 5 6 3 54 55 52 53 57 56 58 59 60 7 8 34 33 32 31 30 36 37 38 29 35 9 11 12 13 14 15 16 17 18 19 20 21 10 1 24 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 15 76 ...

Страница 16: ... circuit board 14 Solenoid valve connector 44 Screw M3 x 6 15 Fixing screw 45 Cable clamp 16 Core guide pipe 46 Cord packing 2 x 315 mm 17 Oval ring 21 8 x 1 5 x 2 5 mm 47 Power control board 18 Valve core with spring 48 Solenoid coil 19 Screw M5 x 20 49 O ring 11 1 x 1 78 mm 20 Membrane cap 50 Screw M4 x 10 21 O ring 5 5 x 1 5 mm 51 Flange 22 Pressure spring 52 O ring 5 x 1 5 mm top O ring 6 x 1 ...

Страница 17: ...44 43 42 39 40 41 28 27 26 25 23 22 4 5 6 3 54 55 52 57 56 58 59 60 7 8 34 33 32 31 30 36 37 38 29 35 9 11 12 13 14 15 16 17 18 19 20 21 10 1 53 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 17 76 ...

Страница 18: ...escription explanation Item Description explanation A Control panel D Condensate discharge B Right cable gland E Valve unit C Left cable gland F Condensate inlet BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 18 76 ...

Страница 19: ...ctivates and the area above the membrane 23 is depressurised The membrane 23 lifts off the valve seat and the excess pressure in the housing X1 presses the condensate into the condensate discharge D X2 23 D 37 When the sensor in the sensor tube 37 is no longer covered by condensate the controller of the pilot valve X2 activates and pressure builds up above the membrane 23 The membrane 23 is presse...

Страница 20: ...Modbus 10 seconds after start up with the following interface parameters Value Parameter Baud rate 19200 Data bits 8 Stop bits 1 Parity even Client address 247 3 5 2 Byte sequence Data type Modbus register Division float 2 Register ABCD u32 2 Register ABCD u16 1 Register AB u8 1 Register A u8 B 3 5 3 Implemented functions The following Modbus functions are supported 1 Read Input Registers 0x04 2 R...

Страница 21: ... LED 100 1 LED 50 2 u16 1702 Status Valve LED LED off 0 LED 100 1 LED 50 2 u16 1760 Main Button State Status TEST button On 1 Off 0 u16 3103 Remaining Time Hi Word Remaining service time float 3104 Remaining Time Lo Word 3105 Remaining Counts Hi Word Remaining switching cycles float 3106 Remaining Counts Lo Word 3200 Error Flags All Error Flags Bit 1 Error1 Flag Bit 2 Error2 Flag Bit 3 Error3 Flag...

Страница 22: ...0 BBS V3 4 0 CFG V1 0 0 ASCII 0x03 VendorUrl BEKO website http www beko technologies com ASCII 0x04 ProductName BEKO product name BEKOMAT ASCII 0x05 ModelName BEKO circuit board designation KA2C OL11 2044 ELV P i4 0 ASCII 0x06 UserApplicationName BEKO serial number circuit board 1912720040 ASCII 0x80 n a Production Circuit board test date 03 01 2018 14 53 16 01 01 01 ASCII 0x81 n a Production Circ...

Страница 23: ...odbus Client address 1 246 Example value 0x070A decimal 1802 For interface parameters see table Index 0x07 decimal 7 Client address 0x0A decimal 10 3 To save the settings write the value 0xBA5E decimal 47710 to the Holding Register 0x139C decimal 5020 4 Switch the product off and switch it back on again 0 The changes will go into effect approx 10 seconds after the restart Parameter HighByte Parame...

Страница 24: ...ce Restart device 0x1773 6003 0x8E40 Restart the device 1 Write the value 0xBEEF decimal 48879 to the Key Register 0x1392 decimal 5010 0 Write access and control command function are released for 1 minute 2 Select the control command from the control command table and write it to the respective Control Holding Register Example Reset the time until the next maintenance Register Value Control Holdin...

Страница 25: ...68 NEUSS Made in Germany 12345678 IP 65 TYPE13 4052588 12345678 0 8 16 bar g 12 230 psi g 1 60 C 34 140 F 24 VDC 10 8W BM13i Example illustration Item Description explanation 1 Product name 2 Operating pressure 3 Operating temperature 4 Material number 5 Operating voltage 6 Manufacturer 7 IP degree of protection 8 Housing class 9 Serial number For more information see 2 4 Explanation of the safety...

Страница 26: ...ion BEKOMAT 13i BEKOMAT 13i CO BEKOMAT 13i CO PN50 DE BEKOMAT 13i BEKOMAT 13i CO BEKOMAT 13i CO PN50 01 xxxx Original Installations und Betriebsanleitung BM13i BM13iCO BM13iCOPN50 Original installation and operation manual 1 x connector BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 26 76 ...

Страница 27: ...ternal hose connection for hose diameter 10 13 mm 0 39 0 51 in internal 1 x G3 8 internal Media Condensate oil contaminated Condensate oil contaminated or oil free Empty weight 2 0 kg 4 4 lbs 2 2 kg 4 8 lbs Operating voltage 24 VDC 10 see type plate Power consumption P 8 0 VA W Degree of protection IP65 Housing class UL50E TYPE 13 Overvoltage category IEC 61010 1 III Degree of pollution IEC 61010 ...

Страница 28: ...60 C 34 140 F 4 3 Materials BEKOMAT 13i 13i CO 13i CO PN50 Housing Aluminium Aluminium hardcoated Membrane FKM 4 4 Dimensions BEKOMAT 13i BEKOMAT 13i CO ø 13 dia 0 5 211 8 31 161 3 34 86 3 38 93 3 66 G1 2 NPT 1 2 G1 2 NPT 1 2 mm inch SW32 1 25 21 0 83 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 28 76 ...

Страница 29: ...1 0 Nm 0 2 Nm 0 74 ft lb 0 15 ft lb Z4 Screws membrane cap valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z5 Screws membrane cap valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z6 Screws valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z7 Hose connection condensate discharge 3 4 Nm 2 21 2 95 ft lb Z8 Screws top cover 0 5 Nm 0 5 Nm 0 37 ft lb 0 37 ft lb Z9 Screws housing main part 30 Nm 5 Nm 22 13 ft ...

Страница 30: ...4 6 Dimensions BEKOMAT 13i CO PN50 SW32 1 25 186 7 32 162 6 38 21 0 83 86 3 38 93 3 66 G1 2 NPT 1 2 G3 8 NPT 3 8 mm inch BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 30 76 ...

Страница 31: ...w solenoid valve connector 1 0 Nm 0 2 Nm 0 74 ft lb 0 15 ft lb Z4 Screws membrane cap valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z5 Screws membrane cap valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z6 Screws valve unit 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Z7 Screws top cover 0 5 Nm 0 5 Nm 0 37 ft lb 0 37 ft lb Z8 Screws housing main part 30 Nm 5 Nm 22 13 ft lb 3 69 ft lb Original installation ...

Страница 32: ...the top cover at the place of installation so that the LEDs are visible and the TEST button can be pressed 4 9 Terminal diagram power control board Illustration ON OFF ON OFF GND 0V RS485 B RS485 A 24 V GND 0V RS485 B RS485 A 24 V Modbus termination BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 32 76 ...

Страница 33: ...of areas exposed to direct sunlight and heat sources NOTE Handling packaging material Inappropriate disposal of packaging materials can cause environmental damage Dispose of the packaging material in accordance with the applicable legal requirements and provisions of the country and place of use 5 1 Transport After transporting and removing the packaging material inspect the product for possible t...

Страница 34: ...working area during assembly installation maintenance and repair work Before pressurisation check all system pipe connections for leak tightness and tighten if necessary Slowly pressurise the system Avoid pressure blows and high differential pressures Assemble all pipes free of mechanical stress Install the feed lines and drain lines as fixed pipes WARNING Insufficient qualification Insufficient q...

Страница 35: ...6 25 ft Drain line version Do not use shut off valves in the drain line Only connect the BEKOMAT to the drain line using a hose 0 The hose compensates for assembly tolerances vibrations and thermal expansion Do not install the drain line on storage or transportation surfaces The drain line may be a maximum of 10 m 32 8 ft long and installed at a maximum of 5 m 16 25 ft rise 0 The minimum operating...

Страница 36: ...line and the drain line must be at least 1 2 interior diameter at least 13 mm 0 5 in Do not fit any reductions in the line e g using reducing nipples or fittings Bypassing filters Discharge each condensate collection point with a separate BEKOMAT Do not create any filter bypass points Ensure venting If the slope in the inflow is not sufficient or there are other problems with the inflow install a ...

Страница 37: ...table end wrench Sealants e g PTFE Feed line Drain line Hose interior diameter 8 10 mm 0 31 0 39 in length approx 30 cm 1 ft Hose clamp Always to be worn Preparatory tasks 1 Depressurise the pressurised system or the respective system section and secure it against unintentional pressurisation 2 Get the hose and hose clamp ready for connection to the condensate discharge Assembly work Illustration ...

Страница 38: ...install a shut off valve X4 in the condensate inlet line X3 4 For the condensate inlet line X3 apply sealant to the end of a pressure resistant pipe and screw this in at condensate inlet F X5 X6 24 5 For the condensate discharge push the hose provided X5 onto the hose connection 24 and use a hose clamp for fixation 6 Connect the other end of the hose X5 with the condensate discharge line X6 BEKOMA...

Страница 39: ...ir work Adhere to all applicable regulations e g VDE 0100 IEC 60364 ATEX during installation Connect the protective conductor earth connection according to regulations WARNING Insufficient qualification Insufficient qualification of the personnel carrying out work on the product and accessories can lead to accidents personal injury and damage to property as well as impair operation All work on the...

Страница 40: ...0 over high voltage cables Only use shielded connection cables for signal transmission Connect the shielding of the connection cables at least to the ground potential or shielding connection of the Modbus server device 7 2 Connection work For connection work to be carried out the following prerequisites must be fulfilled and the preparatory tasks must have been completed Prerequisites Tools Materi...

Страница 41: ...pull the terminal clamp 45 off 4 Remove the plug 7 and screw the cable gland components 4 5 6 off the right cable gland B 6 mm 50 mm 1 97 in 0 23 in 5 Prepare the connection cable X7 4 X7 B 5 6 6 Fit the cable gland components 4 5 6 over the connection cable X7 7 Insert the connection cable X7 into the right cable gland B Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 41...

Страница 42: ... diagram power control board on Page 32 B 4 X7 5 6 45 9 Screw the cable gland components 4 5 6 onto the right cable gland B 10 Fit the screw terminal 45 2 1 11 Set the top cover 2 in place and insert the screws 1 12 Tighten the screws 1 with a torque of 0 5 Nm 0 5 Nm 0 37 ft lb 0 37 ft lb BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 42 76 ...

Страница 43: ... 3 B 4 6 7 3 Raise the top cover 2 slightly and pull the terminal clamp 45 off 4 Remove the plugs 7 and screw the cable gland components 4 5 6 off the right cable gland B and left cable gland C 5 Remove the dust protection pane 3 6 mm 50 mm 1 97 in 0 23 in 6 Prepare connection cable X7 and connection cable X8 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 43 76 ...

Страница 44: ...X8 10 Connect connection cable X7 and connection cable X8 according to the terminal diagram 4 9 Terminal diagram power control board on Page 32 B 4 C 4 X7 5 6 X8 5 6 45 11 Draw cable X7 and connection cable X8 taut 12 Screw the cable gland components 4 5 6 onto the right cable gland B and the left cable gland C 13 Fit the screw terminal 45 2 1 14 Set the top cover 2 in place and insert the screws ...

Страница 45: ...nections for leak tightness and tighten if necessary Slowly pressurise the system Avoid pressure blows and high differential pressures DANGER Electric voltage There is a danger of death or serious injuries as well as malfunction and device failure following contact with components which are in contact with electric voltage Only operate the product with the cover complete and closed or the housing ...

Страница 46: ...BEKOMAT carries out the power on self test 2 Slowly pressurise the system e g by slowly opening the recommended shut off valve X4 in the condensate inlet line X3 3 Carry out a functional test see 10 3 2 Functional test on Page 57 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 46 76 ...

Страница 47: ... or restricted by the use of accessories Adhere to the maintenance intervals DANGER Electric voltage There is a danger of death or serious injuries as well as malfunction and device failure following contact with components which are in contact with electric voltage Only operate the product with the cover or housing complete and closed NOTE Operating personnel Insufficient knowledge of the product...

Страница 48: ... solenoid valve is cycling 0 The BEKOMAT switches to normal operation n 20 n Negative power on self test number of repetitions n 20x The red ALARM LED is on The green VALVE LED is on while the solenoid valve is cycling The green POWER LED is on The solenoid valve is cycling 0 The BEKOMAT goes into fail safe operation continuous loop n The solenoid valve is cycling once per second Ready for operati...

Страница 49: ...M LED is on The green VALVE LED is off The green POWER LED is on n Alarm mode malfunctioning of condensate discharge The red ALARM LED flashes The green POWER LED is on The green VALVE LED is on when the solenoid valve is cycling 0 The solenoid valve is cycling every 4 minutes After the malfunction has been eliminated the BEKOMAT automatically switches to normal operation For further information a...

Страница 50: ...ack on again unintentionally Set up a safety area around the working area during all maintenance and repair work Only operate the product with the cover complete and closed or the housing closed DANGER Use of incorrect spare parts accessories or materials The use of incorrect spare parts accessories or materials as well as auxiliary and operating materials may result in death or serious injury Mal...

Страница 51: ...acement since all parts are disassembled at this point 10 3 Maintenance work For maintenance work to be carried out the following prerequisites must be fulfilled and the preparatory tasks must have been completed Prerequisites Tools Material Protective equipment Screwdriver flat head size 2 5 mm 0 09 Spanner or adjustable end wrench Sealants Suitable lubricant for greasing the O rings Mild cleanin...

Страница 52: ...n explanation 15 14 1 Loosen the screw 14 of the solenoid valve connector 15 14 2 Pull the solenoid valve connector 14 off 12 27 E 3 Loosen the screws 12 27 and take the complete valve unit E off BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 52 76 ...

Страница 53: ...9 and remove together with the washer 10 and the control air cover 11 48 16 5 Pull the solenoid coil 48 up and off the core guide pipe 16 19 49 20 6 Loosen the screws 19 49 and remove the core guide pipe 20 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 53 76 ...

Страница 54: ...ion X X X X X X X X X 7 Replace all the components in the set of wear parts X 8 Grease the O rings in the set of wear parts 23 26 9 Place the membrane 23 in the membrane seat 26 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 54 76 ...

Страница 55: ...e of the membrane 51 16 18 20 50 19 12 Insert the valve core with spring 18 into the core guide pipe 16 Guide the flange 51 with the screws 50 over the core guide pipe 16 and screw tightly on the membrane cap 20 using the screws 19 13 Tighten the screws 50 with a torque of 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb 14 Tighten the screws 19 with a torque of 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb Original ins...

Страница 56: ... Nm 1 48 ft lb 0 37 ft lb 12 14 27 E 29 17 Attach the completed valve unit E to the housing 29 Insert the screws 12 27 and tighten with a torque of 1 5 Nm 0 5 Nm 1 11 ft lb 0 37 ft lb 18 Insert the solenoid valve connector 14 onto the solenoid coil 48 15 14 19 Insert the screw 15 into the solenoid valve connector 14 and tighten with a torque of 1 Nm 0 2 Nm 0 74 ft lb 0 15 ft lb BEKOMAT 13i 13i CO ...

Страница 57: ...iately 10 3 4 Leakage test The leakage test is a non destructive test method and is used to prove leak tightness in vacuum and overpressure systems The leakage test can be carried out in different ways BEKO TECHNOLOGIES provides no recommendations for selecting a testing process The operating company of the pressurised system is responsible for the selection and specification of the test method to...

Страница 58: ...that have become illegible NOTE Local hygiene regulations In addition to the cleaning instructions listed any regionally applicable hygiene regulations must be observed Prerequisites Tools Material Protective equipment Cleaning brush Mild cleaning agent Cotton or disposable cloth Always to be worn Preparatory tasks 1 Decommissioning and disassembly of the BEKOMAT have been completed 2 The BEKOMAT ...

Страница 59: ...0 09 4 Clean the upper opening on the core guide pipe using a cleaning brush Ø max 2 5 mm 0 09 5 Clean the core guide pipe from below using a cleaning brush or a clean cloth 6 Clean the bore in the membrane cap using a cleaning brush Ø max 1 5 mm 0 05 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 59 76 ...

Страница 60: ...membrane cap down using a clean cloth without cleaning agent Concluding work 1 Put the BEKOMAT together 2 Assemble the BEKOMAT see 6 Assembly on Page 34 3 Put the BEKOMAT into operation see 8 Commissioning on Page 45 4 Reset the service intervals see 3 5 3 4 Control commands on Page 24 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 60 76 ...

Страница 61: ...he BEKO TECHNOLOGIES customer services responsible are listed in chapter 1 1 Contact on Page 5 11 2 Accessories Illustration Description Material no Mounting bracket for wall and floor BEKOMAT 13i BEKOMAT 13i CO 2000036 Trace heater 230 VAC 4041657 Thermostatically controlled heating system BEKOMAT 13i BEKOMAT 13i CO 200 230 VAC 2801244 100 115 VAC 2801245 24 VAC VDC 2801247 Insulation shell 20000...

Страница 62: ...e can be downloaded from the BEKO TECHNOLOGIES homepage see 1 1 Contact on Page 5 11 3 Spare parts Illustration Description Material no X X X X X X X X X Set of wear parts contains the marked components X BEKOMAT 13i BEKOMAT 13i CO 2000067 BEKOMAT 13i CO PN50 2000366 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 62 76 ...

Страница 63: ...alve unit BEKOMAT 13i 4027849 BEKOMAT 13i CO 4027850 BEKOMAT 13i CO PN50 4027851 X X X X X X X X X X X X X X X Valve attachment components contains the marked components X BEKOMAT 13i 2000071 BEKOMAT 13i CO 2000072 BEKOMAT 13i CO PN50 2000371 Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 63 76 ...

Страница 64: ...contains the marked components X BEKOMAT 13i BEKOMAT 13i CO 2000073 BEKOMAT 13i CO PN50 2000367 Housing BEKOMAT 13i 2000075 BEKOMAT 13i CO 2000076 BEKOMAT 13i CO PN50 2000368 Top cover 2000066 BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 64 76 ...

Страница 65: ...ce failure following contact with components which are in contact with electric voltage Only carry out maintenance and repair work on the product when it has been disconnected and secured against being switched back on again unintentionally Set up a safety area around the working area during all maintenance and repair work WARNING Insufficient qualification Insufficient qualification of the person...

Страница 66: ... X3 e g by closing the recommended shut off valve X4 2 Press the TEST button briefly multiple times 0 The BEKOMAT is depressurised 0 The condensate remaining in the BEKOMAT is drained 3 Disconnect the BEKOMAT from the voltage supply and switch off all power BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 66 76 ...

Страница 67: ... failure following contact with components which are in contact with electric voltage Only carry out maintenance and repair work on the product when it has been disconnected and secured against being switched back on again unintentionally Set up a safety area around the working area during all maintenance and repair work WARNING Insufficient qualification Insufficient qualification of the personne...

Страница 68: ...as been completed 2 Depressurise the pressurised system or the respective system section and secure it against unintentional pressurisation Dismantling work Illustration Description explanation X4 X3 X4 F F X3 X5 X5 24 24 1 Remove the hose X5 from the hose connection 24 and disassemble 2 Remove the condensate inlet line X3 and the recommended shut off valve X4 from the condensate inlet F and disas...

Страница 69: ... Electrical and electronic equipment are marked by the crossed out rubbish bin The crossed out rubbish bin symbolises that electrical and electronic equipment must be collected separately and must not be disposed of together with unsorted domestic waste For this purpose all communities have set up collecting systems where waste from electronic equipment or electrical and equipment can be handed in...

Страница 70: ...s filter materials cleaning wipes and protective clothing contaminated by oils or other hazardous substances 15 02 02 Adsorption materials filter materials cleaning wipes and protective clothing with the exception of those classified by 15 02 02 15 02 03 Packaging paper and cardboard 15 01 01 Packaging plastic material 15 01 02 Electric and electronic devices with the exception of those covered by...

Страница 71: ... after 5 seconds Inspect the circuit board for potential damage No condensate is drained after the TEST button has been pressed Check the feed line and the drain line Replace wear parts Check the valve function by pressing the TEST button 0 Valve switching can be heard clearly clicking sound Check the connection terminals on the control circuit board Condensate is only drained when the TEST button...

Страница 72: ...hineland for the Canadian and US American market and that basic safety and health requirements were met during manufacturing of the product The product may be sold on the Canadian and US American market EAC marking The EAC marking indicates that a product fulfils all the Eurasian directives applicable for this product and that basic safety and health requirements were met during manufacturing of t...

Страница 73: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 73 76 ...

Страница 74: ...16 2 Declaration of Conformity BEKOMAT 13i 13i CO 13i CO PN50 Original installation and operation manual 74 76 ...

Страница 75: ...Original installation and operation manual BEKOMAT 13i 13i CO 13i CO PN50 75 76 ...

Страница 76: ...4 610 780 639 info es beko technologies es BEKO TECHNOLOGIES LIMITED Room 2608B Skyline Tower No 39 Wang Kwong Road Kwoloon Bay Kwoloon Hong Kong Tel 852 2321 0192 Raymond Low beko technologies com BEKO TECHNOLOGIES INDIA Pvt Ltd Plot No 43 1 CIEEP Gandhi Nagar Balanagar Hyderabad IN 500 037 Tel 91 40 23080275 91 40 23081107 Madhusudan Masur bekoindia com service bekoindia com BEKO TECHNOLOGIES S ...

Отзывы: