Commissioning
EL3692
38
Version: 2.1
Fig. 31: Relationship between user side (commissioning) and installation
The user inserting of certain components (I/O device, terminal, box...) is the same in TwinCAT 2 and
TwinCAT 3. The descriptions below relate to the online procedure.
Sample configuration (actual configuration)
Based on the following sample configuration, the subsequent subsections describe the procedure for
TwinCAT 2 and TwinCAT 3:
• Control system (PLC)
CX2040
including
CX2100-0004
power supply unit
• Connected to the CX2040 on the right (E-bus):
EL1004
(4-channel analog input terminal -10…+10 V)
• Linked via the X001 port (RJ-45):
EK1100
EtherCAT Coupler
• Connected to the EK1100 EtherCAT coupler on the right (E-bus):
EL2008
(8-channel digital output terminal 24 V DC; 0.5 A)
• (Optional via X000: a link to an external PC for the user interface)