Temperature requirements...........................................................................................45
Power requirements.....................................................................................................46
Electrical grounding requirements............................................................................... 46
Server warnings and cautions................................................................................................ 46
Rack warnings........................................................................................................................ 47
Electrostatic discharge............................................................................................................47
Server box contents................................................................................................................48
Installing hardware options .................................................................................................... 48
Configuring the server............................................................................................................ 48
Installing or deploying an operating system............................................................................48
Registering the server.............................................................................................................49
Hardware options installation.................................................................. 50
Product QuickSpecs.......................................................................................................................... 50
Introduction........................................................................................................................................50
Installing the bezel and bezel lock.....................................................................................................50
Power supply options........................................................................................................................ 51
Drive guidelines...................................................................................................................... 52
Supported drive carriers......................................................................................................... 53
Installing a hot-plug SAS or SATA drive..................................................................................53
Installing an NVMe drive.........................................................................................................54
Installing a uFF drive and SCM drive carrier.......................................................................... 55
Installing an M.2 drive.............................................................................................................56
DIMM population information..................................................................................................59
HPE Smart Memory speed information.................................................................................. 60
DIMM label identification.........................................................................................................60
Installing a DIMM.................................................................................................................... 61
Installing a Universal Media Bay....................................................................................................... 63
Drive cage options.............................................................................................................................65
Installing a front 8NVMe SSD Express Bay drive cage.......................................................... 65
Installing a front 6SFF SAS/SATA + 2NVMe Premium drive cage......................................... 67
Installing a front 8SFF SAS/SATA drive cage in box 1........................................................... 69
Installing a front 8SFF SAS/SATA drive cage in box 2........................................................... 71
Installing a front 2SFF NVMe/SAS/SATA Premium drive cage...............................................72
Installing a midplane 4LFF SAS/SATA drive cage..................................................................75
Installing a rear 2SFF SAS/SATA drive cage in the primary or secondary riser..................... 77
Installing a rear 2SFF SAS/SATA drive cage over the power supplies...................................79
Installing a rear 3LFF SAS/SATA drive cage.......................................................................... 82
Installing primary and secondary risers.................................................................................. 84
Installing tertiary risers............................................................................................................85
Installing a secondary riser cage............................................................................................ 86
Installing a tertiary riser cage..................................................................................................87
Installing the 2NVMe slimSAS riser option............................................................................. 89
Installing the 8NVMe slimSAS riser option............................................................................. 90
4
Contents
Содержание BCD221
Страница 7: ...Documentation feedback 157 Contents 7 ...
Страница 27: ...Component identification 27 ...
Страница 43: ...Operations 43 ...
Страница 74: ...9 Install the optical disk drive tray 10 Install the universal media bay 74 Hardware options installation ...
Страница 80: ...Remove the secondary wall blank 6 Remove the tertiary wall blank 80 Hardware options installation ...
Страница 81: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 81 ...
Страница 123: ...LFF models Cable routing Front 8SFF drive options Box 1 to SAS Expander Cable routing Front 8SFF drive options 123 ...
Страница 124: ...Box 2 to SAS Expander All boxes 124 Cabling ...
Страница 126: ...Box 2 Box 3 126 Cabling ...
Страница 127: ...Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for SFF 127 ...