
CAUTION:
For proper cooling, do not operate the server without the access panel, baffles, expansion slot covers,
or blanks installed. If the server supports hot-plug components, minimize the amount of time the access
panel is open.
Procedure
.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack
.
•
Remove the server from the rack
5.
Do one of the following:
• Remove the air baffle.
• Remove the 4LFF midplane drive cage:
a.
Disconnect all cables.
b.
Remove all drives.
Be sure to note the location of each drive.
c.
Remove the drive cage.
CAUTION:
Do not drop the drive cage on the system board. Dropping the drive cage on the system board
might damage the system or components. Remove all drives and use two hands when
installing or removing the drive cage.
38
Operations
Содержание BCD221
Страница 7: ...Documentation feedback 157 Contents 7 ...
Страница 27: ...Component identification 27 ...
Страница 43: ...Operations 43 ...
Страница 74: ...9 Install the optical disk drive tray 10 Install the universal media bay 74 Hardware options installation ...
Страница 80: ...Remove the secondary wall blank 6 Remove the tertiary wall blank 80 Hardware options installation ...
Страница 81: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 81 ...
Страница 123: ...LFF models Cable routing Front 8SFF drive options Box 1 to SAS Expander Cable routing Front 8SFF drive options 123 ...
Страница 124: ...Box 2 to SAS Expander All boxes 124 Cabling ...
Страница 126: ...Box 2 Box 3 126 Cabling ...
Страница 127: ...Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for SFF 127 ...