CAUTION:
THE CONTACTS ARE VERY FRAGILE AND EASILY DAMAGED.
To avoid damage to the
socket
or processor, do not touch the contacts.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
5.
.
6.
Do one of the following:
•
.
•
If installed, remove the 4LFF midplane drive cage
7.
Install the processor heatsink assembly:
a.
Remove the dust cover.
b.
Locate the Pin 1 indicator on the processor frame and the socket.
c.
Align the processor heatsink assembly with the alignment pins and gently lower it down
until it sits
evenly on the socket.
The heatsink alignment pins are keyed. The processor will only install one way.
A standard heatsink is shown. Your heatsink might look different.
d.
Using a T-30 Torx screwdriver, tighten the nuts until they stop.
Hardware options installation
111
Содержание BCD221
Страница 7: ...Documentation feedback 157 Contents 7 ...
Страница 27: ...Component identification 27 ...
Страница 43: ...Operations 43 ...
Страница 74: ...9 Install the optical disk drive tray 10 Install the universal media bay 74 Hardware options installation ...
Страница 80: ...Remove the secondary wall blank 6 Remove the tertiary wall blank 80 Hardware options installation ...
Страница 81: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 81 ...
Страница 123: ...LFF models Cable routing Front 8SFF drive options Box 1 to SAS Expander Cable routing Front 8SFF drive options 123 ...
Страница 124: ...Box 2 to SAS Expander All boxes 124 Cabling ...
Страница 126: ...Box 2 Box 3 126 Cabling ...
Страница 127: ...Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for SFF 127 ...