• Disconnect each power cord from the power source.
• Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack
•
Remove the server from the rack
.
4.
.
5.
6.
Install the riser.
7.
Install any expansion cards, if needed
8.
Connect any data cables to riser or expansion boards.
9.
Install the tertiary riser cage
10.
Connect cables to drive backplanes, if needed.
The installation is complete.
Installing a secondary riser cage
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1.
Observe the following alert:
CAUTION:
To prevent damage to the server or expansion boards, power down the server and remove all AC
power cords before removing or installing the PCI riser cage.
2.
3.
Remove all power:
a.
Disconnect each power cord from the power
source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
86
Installing a secondary riser cage
Содержание BCD221
Страница 7: ...Documentation feedback 157 Contents 7 ...
Страница 27: ...Component identification 27 ...
Страница 43: ...Operations 43 ...
Страница 74: ...9 Install the optical disk drive tray 10 Install the universal media bay 74 Hardware options installation ...
Страница 80: ...Remove the secondary wall blank 6 Remove the tertiary wall blank 80 Hardware options installation ...
Страница 81: ...7 Install the drive cage compatible rear wall 8 Install the drive cage Hardware options installation 81 ...
Страница 123: ...LFF models Cable routing Front 8SFF drive options Box 1 to SAS Expander Cable routing Front 8SFF drive options 123 ...
Страница 124: ...Box 2 to SAS Expander All boxes 124 Cabling ...
Страница 126: ...Box 2 Box 3 126 Cabling ...
Страница 127: ...Cable routing Front 2SFF NVMe drive option for SFF Cable routing Front 2SFF NVMe drive option for SFF 127 ...