![Baroness GM2810 Скачать руководство пользователя страница 61](http://html1.mh-extra.com/html/baroness/gm2810/gm2810_service-manual_3921976061.webp)
Items to Prepare for Measurement
Prepare a pressure gauge for high pressure
measurements, high pressure hose, and O-
ring connector PF1/4PF1/4.
1
2
3
g5t8is-035
Forward_005
1
Pressure gauge for high pressure
measurements
2
High pressure hose
3
O-ring connector PF1/4PF1/4
Reverse
Caution
Before starting pressure measurement, make
sure that there are no people around the
machine.
Remove the plug of the reverse side
measurement point of the 2WD/4WD
changeover valve located in the center
upper area of the pivot of the main unit.
1
2
7edlvx-034
Reverse_001
1
2WD/4WD changeover valve
2
Plug
6.
1.
Attach the O-ring connector to the reverse
side measuring port.
1
7edlvx-035
Reverse_002
1
O-ring connector (1096-6)
Attach the pressure gauge for high
pressure measurements onto the O-ring
connector of the reverse side measuring
port.
2
1
7edlvx-036
Reverse_003
1
Reverse side measuring port
connector
2
Pressure gauge for high pressure
measurements
2.
3.
Hydraulic system
GM2810
Hydraulic system
Page 4-33
Measurement
Содержание GM2810
Страница 1: ...5 Unit Rotary Mower Service Manual Serial No 10001 Ver 1 0...
Страница 4: ...GM2810 Contents...
Страница 10: ...GM2810 Safety Page 1 6 Safety Signs and Instruction Signs...
Страница 11: ...Waste Disposal Page 2 2 About the Waste disposal Page 2 2 Disposal GM2810 Disposal Page 2 1...
Страница 28: ...GM2810 Maintenance standards and maintenance Page 3 16 Greasing...
Страница 82: ...GM2810 Hydraulic system Page 4 54 General inspection and repair...
Страница 118: ...GM2810 Main body Page 6 4 Specifications...
Страница 150: ...GM2810 Operating Machine and Mower Units Page 7 32 Inspection and repair of each section...
Страница 164: ...GM2810 Troubleshooting Page 8 14 Relating to Operating Machine and Mower Unit...
Страница 184: ...GM2810 Reference Page 9 20 RT mechanical brake manual...