
Basic of
D
isassembly
Basic of Disassembly
2 - 23
Needle threading mechanism
Basic of
D
isassembly
2
Removal of Thread unit assy
1. Release the each lead wire of thread unit assy from the securing fixtures.
2. Remove the screw (screw, bind M4x8) to remove the front cover fixed plate from the thread unit assy.
3. Remove the two screws (screw, bind M4x8) to remove the thread unit assy from the arm bed.
Refer to 3 - 30 Needle threading mechanism.
Screw, Bind M4X8
Screw, bind M4x8
Thread unit assy
Front cover fixed plate
Screw, bind M4x8
Содержание BLDY
Страница 1: ...MODEL BLDY BLDY2 Home Sewing Machine SERVICE MANUAL Sep 2014 Jun 2016 Published Revised CONFIDENTIAL...
Страница 2: ......
Страница 3: ...LIST of UPDATE RECORD Date Added Models Contents Changed 4 13 Added 4 52 to 55 May 2015 Jun 2016 BLDY2...
Страница 275: ...Application of Assembly 3 177 Feed module Application of Assembly Application of Assembly Feed module location diagram...