Stratum 3 clock
555-233-116
170
Issue 4 October 2002
7. Bridge the jumper wires to cross-connect from the TN780 in A and B
carriers to the Stratum 3 clock.
8. Dress the cables down sides of the cabinet and run through the cable
Slack Manager, if provided.
9. Administer the switch for the clock.
CCB01R
BK-BL/21
EXTSYN1T
Y-G/35
CCB01T
BL-BK/22
EXTSYN1R
G-Y/37
CCA02R
BK-O/23
EXTSYN0T
V-BL/41
CCA02T
O-BK/24
EXTSYN0R
BL-V/42
CCB02R
BK-G/25
EXTSYN1T
Y-G/35
CCB02T
G-BK/26
EXTSYN1R
G-Y/37
Table 23.
Circuit-pack cross-connects for high or critical reliability — Continued
From Stratum 3 Clock
To TN780 carrier A
To TN780 carrier B
Lead
Name
Lead Color/
Terminal
Lead
Name
Lead Color/
Terminal
Lead
Name
Lead Color/
Terminal
Continued on next page
Содержание MultiVantage
Страница 6: ......
Страница 14: ...Contents 555 233 116 14 Issue 4 October 2002 A Connector and cable pinout charts 231 IN Index 243...
Страница 24: ...About this book 555 233 116 24 Issue 4 October 2002...
Страница 120: ...DEFINITY LAN gateway system 555 233 116 120 Issue 4 October 2002...
Страница 134: ...Terminal server installation 555 233 116 134 Issue 4 October 2002...
Страница 162: ...ISDN converters and adapters 555 233 116 162 Issue 4 October 2002...
Страница 172: ...Busy tone disconnect equipment for non U S installations 555 233 116 172 Issue 4 October 2002...
Страница 178: ...Call detail recording CDR option settings 555 233 116 178 Issue 4 October 2002...
Страница 188: ...DEFINITY INADS 555 233 116 188 Issue 4 October 2002...
Страница 196: ...Music on hold 555 233 116 196 Issue 4 October 2002...
Страница 224: ...Multimedia communications products MMCX MMCH ESM 555 233 116 224 Issue 4 October 2002...
Страница 242: ...Connector and Cable Pinout Charts 555 233 116 242 Issue 4 October 2002...