About the Installation Roadmap and Task Lists
Issue 7 January 2005
39
Configure the G700
on
page 201
- Assign IP addresses to the G700 processors
- Set up IP routing for the stack
- Set up default IP route for the G700
- Check IP connections
- Set up controller list for the G700
- Configure X330 Expansion Module, if
necessary
Prepare to install firmware on
the G700
on page 211
- Verify contents of the tftp directory
- Determine which firmware to install
Install New Firmware on the
G700 Media Gateway
on
page 214
- Install firmware on the P330 stack processor
-Set Rapid Spanning Tree
- Install firmware on the G700 media gateway
processor
- Install firmware on the media modules
- Install firmware on other G700s in the stack or
network, if any
Administer Communication
Manager
on page 219
- Reboot the system
- Assign node names, if necessary
- Administer network regions
- Assign LSPs to network regions
- Administer IP interfaces
- Administer the LSP form
- Add media gateway
- Verify changes
- Enable announcements, if necessary
- Save translations
Complete the Installation
Process
on page 235
- Check planning documentation
- Connect and administer test endpoints
- Complete electrical installation
- Enable adjunct systems
Checklist 2: Install a New G700 without an S8300 (continued)
Major Task
Subtasks
2 of 2