Avanti Installation Manual 2.0
Connection Testing And Customer Reporting
17. COMPLETING THE REPORT WITH AFA
Once testing has been completed and the broadband service has been demonstrated to the customer you are
required to complete the following steps.
17.1 AFA REPORTING REQUIREMENTS
To complete the job the report section on AFA / AMA must be completed with all relevant detail
required. Avanti recommend that certain photographs should be gathered whilst completing the
installation, this will assist when troubleshooting in the future. See next section for details of
photographic recommendations.
17.2 PHOTOGRAPHIC REPORTING RECOMMENDATIONS
1. The first photograph should be of the line of sight from the antenna. This
should be taken with the camera placed back against the antenna reflector
just above the boom arm and clearly show the transceiver in the center of
the shot.
2. The
second
photograph
required is of the
antenna and its
mounting bracket
3.
The
third
Photograph
Should
show
the
Antennas
final
Mounting
Location.