Site Hardware Preparation
.55
Avanti Installation Manual 2.0
12. CABLING
2. Cables should be secured to wall with cable clips, on
vertical runs these should be a maximum of 50cm apart
and on the horizontal 30cm (or hammer length) apart.
Cables can be secured behind downpipes etc, using
cable ties
3. Where the substrate is too hard, i.e. Granite or other stone the use of pin plugs will be required. In this
scenario you will need to drill a 5mm hole first, insert pin plug then proceed using correct cable clip
4. If the cable needs to be run across a flat roof, fit a 50mmx25mm wooden batten and attach the cable to this
5. Cable
should
be
fixed to the antenna arm using cable ties, the cable should not be fed through the support arm
12.7 DRIP AND SERVICE LOOP REQUIREMENTS
1. At cable entry point always leave drip loop, this is to
lessen possibility water migrating into hole
2. A 1 meter service loop should be positioned at the
rear of the antenna and neatly coiled without twists