20
MAN - BBR3 - REV: Original | D. Installation
D.4 Connecting Equipment
The following hoses and cables are shipped with the BBR3. Use them for connecting the BBR3 equipment:
• Zero/Load hose
• Air bearing hose
• Four color-coded electrical cables (integral to base)
• Refrigeration control cable
• Main electrical power cable(s)
7
9
8
6
4
5
6
3
2
1
1. LVDT hook up
2. Load Cell hook up
3. Light hook up
4. Network/Ethernet
5. USB Connection
6. Chiller Communication Port
7. Back of Chiller Unit
8. AC Power Plug
9. Compressed Air
10. Air Bearing Lines
10
Figure D.10 - Connecting the BBR3