![ATS BBR3 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/ats/bbr3/bbr3_instruction-manual_3005234023.webp)
18
MAN - BBR3 - REV: Original | D. Installation
NOTE: If damage is found or suspected, notify the shipper and contact ATS immediately.
D.3 Assembling the Load Nose
Assemble the loading shaft to the load frame assembly.
1. There are four screws securing the shroud to the load frame (Figure D.1). Loosen the back two screws slightly, and
completely remove the front two screws. This should allow you to remove the shroud from the frame.
2. Remove the foam from inside of the load shroud (Figure D.2). Unscrew the lower portion of the load shroud from
the upper portion (Figure D.3). Set the lower portion aside.
3. Retrieve the load nose from the BBR3 gauge kit. Place the load nose in the upper portion of the load shroud.
4. Position the shroud and load nose at the base of the load frame. Lift the load nose and carefully screw it on to the
threaded stud in the bottom of the load cell until it is finger tight. When complete, secure the load nose in place by
tightening the set screw on the side of the load nose (see Figure D.4 and D.5).
Figure D.2 - Foam Inside Load Shroud
Figure D.3 - Unscrew the Lower Portion
of the Load Shroud
Four Screws
Figure D.1 - Load frame screw location