D. Installation
D.1 Recommended Tools
The following tools are recommended for use during installation and operation of Bending Beam Rheometer.
Installation
• 9/16’’ Open Ended Wrench
• Set of Hexagonal Wrenches
• Flat Bladed Screw Driver
Operation
•
Metal tongs for the placement and removal of the specimen from the fluid bath.
• Protective eye wear and gloves for use during testing.
D.2 Unpacking the BBR3
To unpack and prepare the BBR3 for operation, complete the following steps.
CAUTION:
Use care when moving the base unit. The refrigeration unit is attached, and the
refrigeration hose may be damaged if it is twisted or pulled, especially when the unit is cold.
1. Remove the base unit and the refrigeration unit from the box, and place them on a sturdy work surface.
WARNING:
Position the BBR3 in a well-ventilated area. Consider that flammable vapors may be
emitted from the bath during operation. Refer to fluid manufacturer’s MSDS documentation for further
information.
2. Remove the load frame assembly and place it on a sturdy work surface near the base unit.
3. Remove any packing materials from the unit. The following items should also be located and set aside:
•
Case containing the step disk, a non-compliant test beam, a crack sealant non-compliant beam, a confidence
check beam, two anvil adapters, the load nose, and a six-piece weight set.
• Plastic bag containing specimen mold pieces.
• Plastic bag containing crack sealant specimen mold pieces.
4. Inspect the base, the refrigeration unit, and the load frame for any obvious damage that may have occurred during
shipment.