![ATS BBR3 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/ats/bbr3/bbr3_instruction-manual_3005234024.webp)
MAN - BBR3 - REV: Original | D. Installation
19
WARNING:
Do not over tighten the load nose, or damage to the load cell may occur.
5. Once the load nose is secured, lift the upper portion of the shroud around it. Use the back two screws to guide it
into place before tightening them and carefully screwing in the front two screws. See Figure D.6.
CAUTION: Do not over tighten the loading shaft on
the load cell, or the load cell may become damaged.
The load cell is extremely sensitive to this twisting
movement.
CAUTION: The load cell can be easily damaged,
especially from side loading and excessive torque. DO
NOT place Load Frame on its side once the Load Nose
is in place. Improper handling will result in irreversible
Load Cell damage.
6. To re-attach the lower portion of the load shroud, place the lower portion of the shroud on a flat surface.
CAREFULLY lift the load frame, and position it so that the load nose is directly above the lower portion of the
shroud (Figure D.7). Lift the lower portion of the shroud up and gently screw it in to the upper portion (Figure D.8).
Figure D.5 - Tightening the Set
Screw
Figure D.4 - Set Screw Location on
Load Nose
Figure D.7 - Attaching lower
portion of Load Shroud
Figure D.8 - Attaching lower
portion of Load Shroud
Figure D.9 - Attached Load Nose with
Shroud
Figure D.6 - Upper portion of shroud
attached to Load Cell