SAFETY AND MAINTENANCE MANUAL
1NO0024UK-09
35
S
S
S
e
e
e
c
c
c
t
t
t
i
i
i
o
o
o
n
n
n
4
4
4
.
.
.
R
R
R
U
U
U
L
L
L
I
I
I
N
N
N
G
G
G
4.1. CHECKING DURING THE FIRST OPERATION
- Compliance with the Order dated 1
st
March 2004 (France).
- New apparatus, this verification is made by ATN (according to the standards in force)
- This initial verification is valid for 6 months.
4.2. PERIODIC VERIFICATIONS IN FRANCE
- Compliance with the Order dated 1
st
March 2004(France).
- Every 6 months, the aerial work platform must be controlled by an accredited body.
- This verification consists of:
- the examination of the state of conservation
- the running tests:
*brakes
*devices controlling the lowering of the basket
*all the emergency and safety devices (incline, overload...)
4.3. SUITABILITY
Never forget to check before starting to use the aerial work platform that the machine be suitably
adapted to the site. This must be carried out by the user or his manager.
Содержание PIAF 1000R
Страница 2: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 2 DISTRIBUTOR STAMP...
Страница 8: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 8...
Страница 11: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 11 Chapter I USE AND SAFETY...
Страница 12: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 12...
Страница 16: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 16...
Страница 22: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 22...
Страница 34: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 34...
Страница 36: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 36...
Страница 37: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 37 Chapter II MAINTENANCE...
Страница 38: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 38...
Страница 62: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 62 OK 1AU0080 01 2 6 HYDRAULIC DIAGRAM Diagram ref 1HY0026 01...
Страница 77: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 77 3 13 ELECTRICAL DIAGRAM Diagram ref 1EL0023 01...
Страница 78: ...SAFETY AND MAINTENANCE MANUAL 1NO0024UK 09 78 NOTES...