1.
Rest the lift arms on an ASV approved jack stand
to provide clearance for lift cylinder removal. (fig.
14-1)
2.
Disconnect the inlet and outlet hoses from the
cylinder. (fig. 14-2)
3.
Label the hoses according to right and left orienta-
tion to simplify reassembly, then cap and plug the
hoses and fittings to prevent fluid loss and or sys-
tem contamination. (fig. 14-3)
4.
Remove the bolts securing the front and rear lift
arm cylinder pivot pins to the lift arm and lift arm
tower. (fig. 14-4)
5.
Remove the grease fitting from the pivot pins to
allow the installation of the pin removal tool. (fig.
14-5)
6.
Thread the removal tool into each pin, then use
the slide hammer to extract them. (fig. 14-6)
14-2
Rubber Track Loader
14. Lift-Arm Components
14-1
14-2
14-4
14-5
14-6
14-3
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...