9.
Once the track is in position over the idler wheels,
install the inner idler wheel onto the hub and
secure it in place with the mounting bolts. Torque
them to 90 +/- 10 Lb. Ft.
(PT-80 only/fig. 4-29, 4-30, 4-31)
Note:
You may need to use a bar to keep the wheel
from spinning as you torque the mounting bolts to
spec. (fig. 4-31)
10.
Install the scraper onto the suspension rail and
tighten the bolts to secure it in place. (PT-80
only/fig. 4-32)
11.
Install the outer idler wheel and secure it in place
with the mounting bolts. Torque them to 90 +/- 10
Lb. Ft. (fig. 4-33, 4-34)
12.
Perform the track tension adjustment and check
procedures on page 4-4 to complete installation.
4-9
Rubber Track Loader
4. Maintenance
4-31
4-32
4-29
4-33
4-34
4-30
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...