4.
Remove the bolts (6) securing the outer shroud to
the chassis, then remove the shroud. (fig. 8-13)
5.
Remove the upper hydraulic cooler hose. Cap or
plug the hose upon removal. (fig. 8-14)
6.
Loosen and disconnect the lower hydraulic line
from the cooler. Cap and plug the line and cooler
opening upon disassembly. (fig. 8-15)
7.
Loosen the clamps securing the upper and lower
coolant hoses to the radiator, then disconnect the
hoses from the radiator. (fig. 8-16, 8-17)
8.
Tilt the radiator rearward and then remove it from
the machine. (fig. 8-18)
Installation
1.
To install the radiator/oil cooler, reverse the
removal procedure.
8-4
Rubber Track Loader
8. Radiator and Oil Cooler
8-13
8-14
8-15
8-16
8-17
8-18
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...