9.
Gently move the hard lines out of the way to allow
for reservoir removal then zip tie them to the motor
mount to keep them secure. (fig. 9-7)
10.
Disconnect the bucket cylinder hoses from the
hard lines in the upper right portion of the engine
compartment. Remove all line clamps. (fig. 9-8)
11.
Disconnect the lift cylinder hoses from the hard
lines to allow the bucket cylinder lines to be
removed. (fig. 9-9)
12.
Disconnect the bucket cylinder hard lines from the
lift arm control valve and then remove them from
the machine. (fig. 9-10, 9-11)
13.
Remove the hose retainer or move it aside as
shown. (fig. 9-12)
9-3
Rubber Track Loader
9. Hydraulic Reservoir
9-7
9-8
9-9
9-10
9-11
9-12
Retainer
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...