17.
Apply red (high strength) thread locking compound
to the wheel retaining bolt as shown. (fig. 13-30)
18.
Install the bolt and tighten it. (fig. 13-31)
19.
If you haven’t already, repeat steps 10-18 of this
procedure on the other side of the hub/wheel
assembly to secure the second wheel in place.
20.
Once the hub/wheel assembly is together as
shown, torque the wheel retaining bolts to 180 ft.
lbs. to secure them in place. (fig. 13-32)
21.
Remove the allen plug from the center of the hub
assembly and fill it with 2 ounces of ASV 10W-30
Heavy Duty Engine Oil. Then reinstall the plug.
(fig. 13-33, 13-34)
22.
Repeat this procedure on the other half of the
bogie assembly if necessary prior to installing the
two halves back onto the undercarriage.
23.
Place the rubber rods back into position on the
square shaft, then tape them in place to keep
them secure while installing the bogie assemblies
around them. (fig. 13-35)
24.
Reverse steps 1-3 of this procedure to reinstall the
bogie assembly back onto the undercarriage and
complete the procedure.
25.
Repeat this procedure as necessary throughout
the PT-80 undercarriage to restore proper function.
13-7
Rubber Track Loader
13. Undercarriage
13-30
13-32
13-33
13-31
13-34
13-35
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...