Switches
The various switches (Figure 5-3, 5-4, 5-5) are posi-
tioned to provide good access and visibility. The stan-
dard and optional switches are listed below.
(1)
Ignition
(2)
Hour Meter
(3)
Beacon (optional)
(4)
Wiper (optional)
(5)
Heater Fan
(optional)
(6)
Parking Brake
(7)
Headlight
(8)
Bucket Pos.
(9)
Hight Flow Aux.
(10)
Low Flow Aux.
(11)
Hyd. Q/A
5-2
Rubber Track Loader
5. Machine Controls and Instrumentation
5-3
5-4
5-5
1
2
3
4
5
9
10
11
6
7
8
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...