23.
Remove the lower hose restraints to allow the
hoses to be pulled through the chassis. (fig. 9-25)
24.
Pull the hoses up through the chassis opening and
lay them aside as shown (both sides). (fig. 9-26)
25.
Disconnect the wiring running through the hose
passageway and pull it through the opening as
shown. (fig. 9-27)
26.
Remove the bolts securing the metal tank restraint
straps, them remove them from the machine.
(fig. 9-28)
27.
Slide the quick attach and test port tubes forward
so that they do not interfere with the reservoir
(tank) moving upwards in the chassis. (fig. 9-29)
28.
Slide the various control hoses to the side of the
reservoir (tank) so that they do not interfere with
the tank moving upwards in the chassis. (fig. 9-30)
9-6
Rubber Track Loader
9. Hydraulic Reservoir
9-26
9-25
9-27
9-28
9-29
9-30
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...