7.
Using a rubber mallot, gently tap the shaft and
bearing out of the casing for inspection or replace-
ment. (fig. 16-55)
Drive Pump
Assembly
1.
Using a rubber mallot, gently tap the shaft and
bearing into the casing until seated. (fig. 16-56)
2.
Replace the seal with a new one and install taking
care not to damage it upon installation. (fig. 16-57)
3.
Install the snap ring that secures the shaft, bear-
ing, and seal in place. (fig. 16-57)
16-12
Rubber Track Loader
16. Hydraulic Component Service
16-55
16-56
Required Tools
Combination/Socket wrench
Allen Wrench/Socket
Rubber Mallot
Screwdriver (blade type)
Snap RIng Pliers
16-57
Содержание PT-70
Страница 2: ......
Страница 3: ...PT 70 PT 80 Service Manual Printed 1 08 ...
Страница 4: ......
Страница 8: ...IV ...
Страница 14: ...1 6 ...
Страница 24: ...Lift Arm Control line routing Figure 3 8 PT 70 80 Lift Arm Control 3 8 Rubber Track Loader 3 Circuit Diagrams ...
Страница 44: ...4 20 ...
Страница 54: ...6 8 ...
Страница 92: ...12 8 ...
Страница 110: ...14 6 ...
Страница 114: ...15 4 ...
Страница 130: ...16 16 ...
Страница 138: ...17 8 ...
Страница 142: ...18 4 ...
Страница 144: ...19 2 ...
Страница 146: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com ...