219
and enter it using the numeric keypad. You may now store the new calibration
number by pressing the ENTER key or escape by pressing the EXIT key or the
RESET button.
Calibration of LCT MD: UL 544NP Measuring Device
The load/meter screen and prompt screens will contain the following text for this
calibration point:
Upper Right Screen
Load/Meter
Lower Right Screen
Prompt
Lower Right Screen
Prompt (Cal. Active)
Connect 2.0VDC in series
with a current meter to
Probe-HI + and Probe-LO
-.
When the power supply
and meter are connected,
press TEST to start the
calibration.
Enter Standard Current
Reading.
Press the TEST button to activate the calibration. After the calibration is activated, the
lower right screen will change to the text indicated in the table above (
Cal. Active
).
You may now store the new calibration number by pressing the ENTER key or escape
by pressing the EXIT key or the RESET button.
Calibration of LCT MD: UL 544NP Measuring Device
The load/meter screen and prompt screens will contain the following text for this
calibration point:
Upper Right Screen
Load/Meter
Lower Right Screen
Prompt
Lower Right Screen
Prompt (Cal. Active)
Connect 2.0VDC in series
with a current meter to
Probe-HI + and Probe-LO
-.
When the power supply
and meter are connected,
press TEST to start the
calibration.
Enter Standard Current
Reading.
Press the TEST button to activate the calibration. After the calibration is activated, the
lower right screen will change to the text indicated in the table above (
Cal. Active
).
Read the measurement from your standard and enter it using the numeric keypad.
You may now store the new calibration number by pressing the ENTER key or escape
by pressing the EXIT key or the RESET button.
Calibration of LCT MD: IEC60601-1 / UL2601 Measuring Device
The load/meter screen and prompt screens will contain the following text for this
calibration point:
Upper Right Screen
Load/Meter
Lower Right Screen
Prompt
Lower Right Screen
Prompt (Cal. Active)
Connect 2.0VDC in series
with a current meter to
Probe-HI + and Probe-LO
-.
When the power supply
and meter are connected,
press TEST to start the
calibration.
Enter Standard Current
Reading.
Содержание OMNIA II 8204
Страница 8: ...2 This Page Intentionally Left Blank ...
Страница 87: ...81 conditions The different combinations are represented in the table below ...
Страница 91: ...85 ...
Страница 92: ...86 ...
Страница 139: ...133 7 128 Power On PROMPT ESR ESE STB SPOLL SRE ESE SRE ...
Страница 141: ...135 and added to with the ADD command This will avoid constantly writing to the non volatile memory ...
Страница 142: ...136 ...
Страница 156: ...150 appear on the display ...
Страница 169: ...163 Print Report Example ...
Страница 181: ...175 ...