199
If the instrument fails the Verification (test pass, indicating the fail detectors are not
working properly) the TEST button will illuminate and the following pop-up message
will appear over the metering screen:
9.1.5. IR Verification
From the FailCHEK
screen, press the “IR” soft key. A pop-up message will now be
displayed. The message will appear as follows:
Follow the instructions given in the pop-up message and then press TEST to begin
the verification process. During the Verification process the metering screen for the
related process will be displayed, refer to section
5.4. Perform Tests Metering
for
Содержание OMNIA II 8204
Страница 8: ...2 This Page Intentionally Left Blank ...
Страница 87: ...81 conditions The different combinations are represented in the table below ...
Страница 91: ...85 ...
Страница 92: ...86 ...
Страница 139: ...133 7 128 Power On PROMPT ESR ESE STB SPOLL SRE ESE SRE ...
Страница 141: ...135 and added to with the ADD command This will avoid constantly writing to the non volatile memory ...
Страница 142: ...136 ...
Страница 156: ...150 appear on the display ...
Страница 169: ...163 Print Report Example ...
Страница 181: ...175 ...